Operational phase
The operational phase of a building refers to the period of time during which the building is being used for its intended purpose. It begins after construction is completed and the building is occupied, and continues until the building is no longer in use or is repurposed for a different use.
During the operational phase, the building's systems and components, such as heating, ventilation, and air conditioning (HVAC), lighting, plumbing, and electrical systems, are operated to maintain a safe, comfortable, and functional environment for the occupants.
The operational phase also includes regular maintenance and repairs to ensure the building remains in good condition and continues to function properly. This may include tasks such as cleaning, replacing filters, fixing leaks, inspecting equipment and so on.
The operational phase is a critical period for ensuring the longevity and functionality of a building, and requires ongoing attention and care. It may involve a number of stakehoders:
- Building owners, responsible for ensuring that the building operates efficiently and effectively. This may involve hiring a property management company to oversee day-to-day operations, as well as ensuring that necessary repairs and maintenance are performed.
- Property managers, responsible for overseeing the day-to-day operations of the building, including coordinating maintenance and repairs, ensuring compliance with building standards and regulations, and addressing occupants concerns.
- Facility managers, responsible for maintaining the building's systems and equipment, such as HVAC, electrical, plumbing, and security systems, to ensure that they are functioning properly and efficiently.
- Maintenance staff, responsible for performing routine maintenance tasks, such as cleaning, painting, and landscaping, as well as addressing any repairs or maintenance needs that arise.
- Tenants or occupants of the building play a role in the operational phase by reporting any maintenance or repair needs to the property manager or maintenance staff and following building operating procedures to ensure the safety and functionality of the building.
- Contractors and suppliers may be involved in the operational phase of a building by providing services such as repairs, maintenance, cleaning, and security. Building owners and property managers may hire these individuals or companies to perform necessary tasks to keep the building running smoothly.
[edit] Related articles on Designing Buildings
Featured articles and news
50th Golden anniversary ECA Edmundson apprentice award
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Digital technology, transformation and cybersecurity
Supporting SMEs through Digitalisation in Construction.
Villa Wolf in Gubin, history and reconstruction. Book review.
Construction contract awards down one billion pounds
Decline over the past two months compared to the same period last year, follows the positive start to the year.
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.