Gross site area
For the purposes of determining housing density, ‘gross site area’ is the total land area as part of the development. Infrastructure and services serving a wider area (such as parks and open space) are considered part of the gross site area. This includes:
- Major distributor roads.
- Primary schools, churches, shopping areas etc.
- Open spaces serving the wider areas.
- Significant landscape buffering strips.
Net site area is the land that is available for development. It is also referred to as the area of developable land. The net site area is more than the land for dwellings and private space and includes other areas that contribute to the use and enjoyment directly linked to the developed dwellings. This includes:
- Access roads within the site.
- Private garden space.
- Car parking space.
- Incidental open space.
- Children’s play areas.
In planning practice it is common to determine net site area as a percentage of gross site area, known as the gross to net ratio.
Ref Telford & Wrekin Council Local Plan 2011 – 2031 Technical Paper. Density and net site area study, July 2015.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.






















