Lamp efficacy
According to BRE’s The essential guide to retail lighting:
Lamp efficacy (or luminous efficacy) is ‘The ratio of the light output from a light source to the power consumed; measured in lumens per Watt (lm/W). The higher the efficacy value of a lamp or lighting system, the more energy-efficient it is.’
‘For example, the efficacy of a 60 W incandescent light bulb is 12 lm/W, and of an 11 W CFL (compact fluorescent lamp) is 55 lm/W. For a 36 W fluorescent tube it is 91 lm/W. This last figure is a lamp efficacy; it excludes the power consumed by the ballast that is needed to run the discharge lamps.’
Ballast or control gear, is ‘Part of the control equipment of fluorescent or discharge lamps, used to stabilise the current. The older, traditional main-frequency ballast can consume up to 20-25% of the total lamp current. A modern electronic ballast working at high frequency consumes about 30% less current, and can be used to regulate or dim the lamp output.’
See also: Lighting efficacy
[edit] Related articles on Designing Buildings Wiki
- Artificial lighting.
- Ballast or control gear.
- Colour appearance.
- Colour Rendering Index CRI.
- Daylight benefits in healthcare buildings.
- Daylight factor.
- Daylight lighting systems.
- Dichroic reflector.
- Discharge lamp.
- Extra-low voltage lamps.
- General lighting v task lighting.
- Illuminance.
- Lamps.
- Light pollution.
- Lighting.
- Lighting efficacy.
- Lighting energy numeric indicator LENI.
- Lighting of construction sites.
- Luminaire efficacy.
- Lux.
- Rights to light.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.
New and updated CLC building safety guidance.
New UK National Buildings Database.