Inflatable building
Inflatable buildings are constructed using two layers of membrane connected together to form inflatable 'cushions'. Membranes are usually less than 1 mm thick, and air is used to pressurise the cavity between them to form a 'rigid', structurally stable element, capable of spanning large distances.
Inflatable buildings differ from air-supported buildings, which are formed by a single-layer membrane that is supported by pressurisation of the whole interior of the building. An air-supported building prevents air from being lost when access points are opened by using airlocks, which maintain the level of air pressure inside the occupied space. Inflatable buildings have a lower power requirement than inflatable buildings as they require a lower volume of pressurised air.
Inflatable buildings are typically used for warehouses and other storage facilities, sports facilities, stadia, shopping centres and so on. Since the amount of material used for inflatable buildings is relatively low, they can be portable, with the air allowed to escape before the membrane is packed down to a small volume.
Inflatable structures (or inflatables) can also be used to create specific components such as; escape slides, mattresses, swimming and paddling pools, play slides, bouncy castles, and so on.
Legal requirements apply to the supply, hire and use of inflatable play equipment for commercial purposes, but not to private, domestic buyers and users. Inflatables can be dangerous in terms of user injuries as well as being unsuitable in high winds if inadequately secured.
Inflatables should be checked before buying or hiring for an event to ensure they comply with BS EN 14960. A label should provide information about when the inflatable was made, how many people can use it and their maximum heights. Once the inflatable is fully inflated, it should be inspected prior to use to check that the site is suitable, that the anchorages are secure, and the internal air pressure provides a firm footing.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Gasholders: a history in pictures. Book review.
Recognition, influence and growth
SocEnv identifies three strategic pillars in new strategy to 2045.
Discover the future of roofing, cladding and insulation.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.