How to write a method statement
Method statements are widely used in construction as a means of controlling specific health and safety risks that have been identified (perhaps following the preparation of a risk assessment), such as lifting operations, demolition or dismantling, working at height, installing equipment, the use of plant, and so on.
A method statement helps manage the work and ensures that the necessary precautions have been communicated to those involved. Method statements should be written by a competent person who is familiar with the process being described and may need to be agreed between the client, principal contractor and contractor.
The first stage involves examining the work activity or process in question in preparation for writing the statement about it. The potential hazards of the work should be identified, including anything that has the potential to cause ill health or harm to anyone involved.
There should then be an analysis of what has been done to mitigate against these risks and whether the mitigation measures are sufficient. The guide term ‘As Low As Reasonably Practicable’ (ALARP) should be followed, and if necessary, further safety measures adopted.
The method statement typically begins with a header which contains important information for site staff and clients. This can include:
- The title of the job.
- The site address.
- Company name, address, logo, contact details, etc.
- Start and end dates for the proposed work.
- Description of the work.
- Health and safety contacts.
- Issue date.
- Unique document number.
The method statement should then provide further details relating to the specific work activity. These tend to focus on the type of personal protective equipment (PPE) that will be used for site operatives, as well as any environmental or quality considerations that are of particular importance.
The next section of the method statement will typically provide details such as:
- First aid procedures.
- Staff training required.
- Work permits and other permissions required.
- Scaffolding and working platforms that may be required.
- Site access and egress.
- Materials that will be handled and how they will be stored.
- Construction plant to be used and shut-down procedures.
- Emergency procedures.
- How existing structures will be safeguarded.
The final section of a method statement should set out step-by-step instructions as to how the work activity should be safely carried out and completed.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).