How to write a method statement
Method statements are widely used in construction as a means of controlling specific health and safety risks that have been identified (perhaps following the preparation of a risk assessment), such as lifting operations, demolition or dismantling, working at height, installing equipment, the use of plant, and so on.
A method statement helps manage the work and ensures that the necessary precautions have been communicated to those involved. Method statements should be written by a competent person who is familiar with the process being described and may need to be agreed between the client, principal contractor and contractor.
The first stage involves examining the work activity or process in question in preparation for writing the statement about it. The potential hazards of the work should be identified, including anything that has the potential to cause ill health or harm to anyone involved.
There should then be an analysis of what has been done to mitigate against these risks and whether the mitigation measures are sufficient. The guide term ‘As Low As Reasonably Practicable’ (ALARP) should be followed, and if necessary, further safety measures adopted.
The method statement typically begins with a header which contains important information for site staff and clients. This can include:
- The title of the job.
- The site address.
- Company name, address, logo, contact details, etc.
- Start and end dates for the proposed work.
- Description of the work.
- Health and safety contacts.
- Issue date.
- Unique document number.
The method statement should then provide further details relating to the specific work activity. These tend to focus on the type of personal protective equipment (PPE) that will be used for site operatives, as well as any environmental or quality considerations that are of particular importance.
The next section of the method statement will typically provide details such as:
- First aid procedures.
- Staff training required.
- Work permits and other permissions required.
- Scaffolding and working platforms that may be required.
- Site access and egress.
- Materials that will be handled and how they will be stored.
- Construction plant to be used and shut-down procedures.
- Emergency procedures.
- How existing structures will be safeguarded.
The final section of a method statement should set out step-by-step instructions as to how the work activity should be safely carried out and completed.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.