Future Skyline London
Contents |
[edit] Recently completed landmark developments
- The Scalpel by Kohn Pedersen Fox Associates, developed by WRBC Development UK Limited
- 22 Bishopsgate by PLP Architects, developed by AXA Real Estate
- One Leadenhall by Make Architects, developed by Brookfield Properties
[edit] Consented landmark developments of the future
- 8 Bishopsgate by Wilkinson Eyre, developed by Stanhope, 2022
- One Undershaft by Eric Parry Architects, developed by Aroland Holdings, 2026
- 55 Gracechurch Street by Fletcher Priest Architects, developed by Tenacity, 2026
- 100 Leadenhall by Skidmore, Owings & Merrill, developed by Lai Sun Developments, 2027
- 70 Gracechurch Street by Kohn Pedersen Fox Associates, developed by Tenacity, TBD
- Gotham City by MAKE Architects, developed by Nuveen, TBD
- 50 Fenchurch by Eric Parry Architects, developed by Capital Real Estate Partners, TBD
[edit] Canceled
The Tulip by Fosters + Partners, blocked by London’s mayor in 2019, appealed in 2020, mayor's decision upheld in 2021
3D London model and Future Skyline models by AccuCities.
[edit] Related articles on Designing Buildings
Featured articles and news
Key proposed changes in Amendment 4 to BS 7671:2018
Draft for Public Consultation from now to 3 November 2024.
World Green Building Week 9-13 September
Join in the 16th annual event led by the World GBC.
Specifying XPS in masonry cavity walls below DPC level
Moisture requirements, DPCs and third party certification.
Types of rigid foam insulation
A brief description and some of the main construction types.
Metal composite material panel systems MCM and MCP
Sandwich finishes, forms, details, core and their impacts.
Cumbria's vernacular architecture
A history of building impeded by unsettled times.
CIOB and MMC Ireland announce strategic partnership
For better working conditions, and a more productive construction sector.
More than just glass.
Grenfell Phase 2 final report for construction, at a glance
Twenty-three key issues raised and their recommendations.
Industry responds to the final Grenfell inquiry phase 2 report
Construction body responses to the long-awaited 7 volumes.
Chief construction advisers in brief
From July 2008 to November 2015.
The Grenfell phase 2 final report key summary points
And recommendations for the construction industry.
Approved Document B: Fire Safety upcoming updates
Including sprinklers in care homes, National classes and Fire resistance.
CIOB Podcast: 21st Century Construction
Catch up on the many previous episodes.
Tools and processes supporting a robust golden thread
BSRIA Handover Information and O&M Manuals guidance.
IHBC Conservation Professional Practice Principles
Spotlighted in HEF Historic Environment Overview.