First prepare the materials you need according to the product description and the different proportions of the preparation. Then gather the tools. Commonly used tools for wall painting include colour separation paper, kraft paper, wall painting rollers, brushes, putty knives, sandpaper, dust sheets and so on.
To protect yourself from paint splashes wear overalls, gloves and goggles. If painting inside ensure that the room is well ventilated. Follow health and safety advice on the paint tin and if using a ladder.
Steps and methods of operation include:
[edit] 1. Basic treatment
Clean up the peeling and loose parts of the wall, and repair it with an appropriate filler. Where there are cracks, kraft paper tape and white latex may be used to stick to the cracks.
Non-load-bearing may need to be pasted. Try to choose better wall cloth and white latex or grid cloth. The grid cloth will have a better anti-cracking effect.
[edit] 2. The interface agent can be brushed
When brushing the interface agent, it must be brushed evenly. It is possible to enhance the adhesion to the base layer, avoid the hollowing and shelling of the plaster layer. This replaces the manual chiseling process and can save time and effort.
[edit] 3. Wall levelling
Uneven walls should be levelled with plaster so that the error of the wall does not exceed 3 mm. If the angles are not straight, plaster should be applied and a ruler should be used to make sure it is straight.
[edit] 4. Apply the putty
Putty with higher particle fineness and harder texture is better. Putty should be batched three times.
The first pass is generally thicker because it involves levelling. The second and third passes are thinner, mainly for lightening so that the wall looks smoother and flatter.
After three batches, the thickness of the putty should not exceed 3 mm, otherwise it will be easy to crack.
[edit] 5. Polish
This is a very critical step in the process. Try to use finer sandpaper. If the sandpaper is too thick, it will leave deep marks. After polishing, be sure to clean the wall thoroughly to avoid too much dust, which will have an impact on the adhesion of the paint.
[edit] 6. Apply primer
The primer must be evenly painted to ensure that every part of the wall is primed. If the has a large amount of paint, it is best to add a little more water to the primer to ensure that the entire surface is covered.
[edit] 7. Look for blemishes
After the putty is polished, there will be some blemishes. Under normal circumstances, it may be difficult to see clearly. It will be obvious only after brushing the paint once. At this time, it is necessary to check for repairs. See if the polish is even and the primer is applied across the entire surface.
[edit] 8. Work carefully
Do not add too much water to the top paint and when painting, pay attention to the corners of the walls, the indirect stubble part of each roll, and the direction of the paint flow.
Allow sufficient time before applying a second coat.
[edit] 9. Cleaning Up and Disposal
Wipe off as much paint as possible from the brush or roller against the edge of the tin. If using a water based paint wash the brush in water. If using a solvent based paint wash the brush in a solvent based cleaner. Solvent based cleaner can saved in a bottle for re-use.
Do not poor waste paint down the drain. It can clog up the drain, is bad for the environment and is illegal.
Give unused paint to family, friends or community paint recycling schemes.
Liquid paint should not be thrown out with general waste. Take the lid off the tin and leave it to go solid. Adding sawdust or sand can speed up this process.
[edit] Related articles on Designing Buildings
Featured articles and news
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.