Detailed design report
The detailed design report is prepared by the lead consultant for the client at the end of the detailed design stage, when the design is detailed but has yet to be packaged.
The detailed design report might include:
- A design and access statement.
- Site layout plans.
- Functional layouts.
- Circulation and operational strategy.
- Floor plans, sections and elevations.
- 3d modelling.
- Details of wall enclosures.
- Details of doors and windows.
- Details of key specification items such as door handles, plumbing fixtures and so on.
- Reflected ceiling plan.
- Key technical designs.
- Co-ordination between architectural and engineering design.
- Phasing, demolition and decanting strategies.
- The use of materials and the potential for re-use, recycling and waste handling (see site waste management plan).
- Structural design criteria.
- Drainage.
- Sustainability.
- Cleaning and maintenance strategy.
- Site services analysis (existing gas, water, electrical, mechanical, etc. services).
- Building services design criteria.
- Services strategy.
- Health and safety strategy.
- Fire strategy.
- Status of approvals.
- Risk assessment.
- Cost plan.
- Programme and phasing.
- Procurement strategy.
The report should highlighting any instructions required from the client.
It should only include required, or key co-ordinated information and necessary interpretation and should not duplicate information that already exists elsewhere.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
From medieval scribes to modern word art.
Electrical contractors welcome crackdown on late payment and push for clean energy.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.
Setting Expectations on Competence Management
Industry Competence Committee.
New Scottish and Welsh governments
CIOB stresses importance of construction after new parliament elections.
The sad story of Derby Hippodrome
An historic building left to decay.
ECA, JIB and JTL back Fabian Society call to invest in skills for a stronger built environment workforce.
Women's Contributions to the Built Environment.
Calls for the delayed Circular Economy Strategy
Over 50 leading businesses, trade associations and professional bodies, including CIAT, and UKGBC sign open letter.
The future workforce: culture change and skill
Under the spotlight at UK Construction Week London.
A landmark moment for postmodern heritage.