Design flood event
For the purposes of the Home Quality Mark, a design flood event is a historic or notional flood event of a given annual probability, against which the suitability of a proposed development is assessed and mitigation measures, if any, are designed.
The design flood level is the maximum estimated water level during the design storm event including an allowance for climate change in line with current best practice national planning guidance. The design flood level for a site can be determined through either known historical data or modelled for the specific site.
Ref Home Quality Mark One, Technical Manual SD239, England, Scotland & Wales, published by BRE in 2018.
See also: Flood event.
[edit] Related articles on Designing Buildings
- BREEAM Flood risk management.
- BREEAM Surface water run-off.
- BRE articles.
- Changing attitudes to property flood resilience in the UK
- Flood.
- Flood level.
- Home Quality Mark.
- Building Research Establishment.
- Flood and Water Management Act.
- Flood event.
- Flood plain
- Flood risk
- Flood risk assessment.
- Flood risk management plan
- Flood zone
- Flood defences
- Planning for floods.
- Property flood resilience
- Surface water
- Sustainable urban drainage systems.
Featured articles and news
Not buildings. Happy holiday from DB.
Future Homes Standard: Industry calls for more ambition
As the Government FHS consultation finally closes.
Improving government projects with data and AI
Enabling better outcomes, efficient modern delivery and influential leadership on government projects.
BSRIA Living Laboratory Innovation Challenge
Final days for submission, closing March 29.
Windows, their frames, forms, factors and functions.
The hidden subtleties of U-Value calculations
Different contexts and what to include as variables.
A brief run down with related articles.
Electrical sector calls for safer public EV charge points
Serious concerns about electrical safety in the public domain.
Building Blocks manifesto presented to parliament
Architects Declare call in for support of five critical policies.
The four elements of project management with APM
Analysis, expectations, collaborative communication and partnerships.
City of London launches Heritage Building Retrofit Toolkit
Empowering owners to initiate necessary adaptations.
Guidance on RAAC in listed buildings
Published by Purcell, endorsed by IHBC, SPAB and C20.
Learning from the past.
Reluctance to hire people with criminal convictions revealed
Employing People with Criminal Convictions Report.
Tackling unconscious bias; Women's History Month
Personal reflections, as the last week of March approaches.