Design and build: appointment
This stage describes the process of making appointments, such as: independent client advisers, members of the consultant team, the employers agent, site inspectors and so on. This stage is likely to be repeated a number of times during the project.
For information about selecting the contractor, see: Design and Build: Tender.
Contents |
[edit] Identifying the need to make appointments.
The client identifies the need to make an appointment. In some cases, existing consultants may identify a requirement and bring this to the attention of the client.
The client may decide they need advice or assistance from independent client advisers or from existing members of the consultant team to help them make the appointment.
The client determines the selection procedure that will be adopted. This might be a process of recommendation, research and interview, open competition (with or without design), selective competition (with or without design), or an existing relationship such as a framework agreement. The client may have to follow a pre-determined procedure if there are in-house rules governing appointments, if they are a local authority or other public body, or if the project will be publicly funded. Such procedures may include assessing whether OJEU procurement rules are likely to apply, which can cause significant delays unless implemented early in the project, as the procedures that must be followed are quite lengthy.
[edit] Agreeing the exact nature of appointments required.
The client agrees the wording of any adverts that are required (such as OJEU adverts) and if appropriate prepares a pre-qualification questionnaire. If it has not already been done, the client prepares documentation describing the nature of the development (such as a strategic brief).
The client defines the schedule of services that will be required, along with selection criteria, form of appointment and contract terms for the appointment. The schedule of services that will be required might include services that are not included on standard forms of appointment, or may be considered 'additional services'. Additional services could include: post-occupancy evaluation services, the use of building information modelling, the preparation of an outline planning application and so on.
The client prepares a formal request for proposals. If design proposals are requested, it is best practice to offer payment to candidates. This ensures that candidates give their full attention to preparing their proposals (which is in the best interests of the client) and ensures that the candidates feel they will be treated fairly by the client.
[edit] Preparing a list of possible candidates.
The client prepares a long list of possible candidates, either from recommendations, existing relationships or expressions of interest received in response to adverts.
The candidates may be required to complete a pre-qualification questionnaire, or there may be some other assessment procedures (such as interviews) that results in the preparation of a short list invited to submit proposals. Such assessments may include evaluating experience and capability, checking professional indemnity insurance, assessing CDM competence, checking references and so on. Short-listed candidates are then invited to submit consultant's proposals in response to the client's request for proposals.
[edit] Selecting the preferred candidate and making the appointment.
The client collates responses to queries from candidates and issues these responses to all candidates.
The client receives and opens the consultant's proposals and makes a record of the fee proposals of each candidate. In some circumstances fee proposals may be submitted in a sealed envelope and opened separately from the rest of the consultant's proposals so that the assessment procedure is not initially prejudiced by the fee (which it may be possible to negotiate down).
The client assesses the consultant's proposals. They may seek advice from existing consultants or independent client advisers to help them do this.
The client then invites the candidates to interview, identifies the preferred candidate(s) and opens negotiations with the preferred candidate(s).
The client appoints the selected candidate and if appropriate arranges a consultant team start-up meeting.
The client informs other candidates that they have been unsuccessful. It is best practice to give clearly thought-out, specific feedback to unsuccessful candidates as they have taken the time to prepare proposals, often for no fee. Candidates greatly appreciate this feedback and will be more likely to express interest in future projects.
Featured articles and news
New Architects Code comes into effect in September 2025
ARN Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).
Ebenezer Howard: inventor of the garden city. Book review.
The Grenfell Tower fire, eight years on
A time to pause and reflect as Dubai tower block fire reported just before anniversary.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.
Construction contract awards hit lowest point of 2025
Plummeting for second consecutive month, intensifying concerns for housing and infrastructure goals.
Understanding Mental Health in the Built Environment 2025
Examining the state of mental health in construction, shedding light on levels of stress, anxiety and depression.
The benefits of engaging with insulation manufacturers
When considering ground floor constructions.
Lighting Industry endorses Blueprint for Electrification
The Lighting Industry Association fully supports the ECA Blueprint as a timely, urgent call to action.
BSRIA Sentinel Clerk of Works Training Case Study
Strengthening expertise to enhance service delivery with integrated cutting-edge industry knowledge.
Impact report from the Supply Chain Sustainability School
Free sustainability skills, training and support delivered to thousands of UK companies to help cut carbon.
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.