CLC publishes Construct Zero Performance Framework
On 20 July 2021, the Construction Leadership Council (CLC), of which ECA is a key contributing member, published a set of clear targets for the industry to unite behind in its mission to drive carbon out of the sector. Named the Construct Zero Performance Framework, it seeks to provide Government and industry with a comprehensive view at a sector level on progress towards net zero. Measures include tracking the number of domestic retrofits achieved, changes in the amount of non-diesel plant in use and reductions in the amount of energy used to produce key products.
The Performance Framework was developed in consultation with industry, with more than 2,500 comments received from industry to shape the framework. The commitments map to the nine priorities for carbon reduction outlined by the CLC in March 2021. It is considered to be the start of a conversation which will be refined and iterated over time to align with industry and workforce changes.
The headline commitments in the framework are:
- 78% of diesel plants to be eliminated from construction sites by 2035.
- Close the productivity gap between construction and economy average output per worker by 2035.
- From 2025, planning applications from the sector must connect to public/active transport and include EV charging where parking is provided.
- Working with Government to deliver retrofitting to 27 million homes by 2040.
- From 2025, all new buildings will be designed with low carbon heating solutions.
- From 2025, we will deliver new homes and buildings which will minimise energy demand and reduce emissions in operation by 75% (dwellings) and at least 27% (commercial buildings) compared to current standards.
- Every person buying from the sector (business or member of the public) will be provided with carbon data by 2030 to make informed lower carbon choices.
- From 2022, we will give all our clients the chance to become net zero by offering alternative net zero design options to clients, even if not scoped.
- By 2035, we will have reduced construction product emissions by 66% from 2018.
- We will target 1,500 of the sector’s businesses and clients to sign up to a measurable carbon reduction plan (including Race to Zero, Science based Targets or Climate Hub) by 2025.
Details of each measure are available on the CLC’s Construct Zero web hub. Data will be gathered on a quarterly basis and published as an industry carbon ‘dashboard’.
This article originally appeared on the ECA website. It was published on 20 July 2021.
--ECA
[edit] Related articles on Designing Buildings
- Articles by the Electrical Contractors' Association (ECA).
- C02nstruct Zero programme.
- CO2nstruct Zero programme grows to over 70 businesses.
- Construction Leadership Council CLC.
- Net zero carbon 2050.
- Net zero by 2050.
- Net zero carbon building.
[edit] External resources
- CLC, CO2nstructZero.
Featured articles and news
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.




















