Permission
In general, the term 'permission' refers to allowing, consenting or authorising something.
In relation to property, permissions sometimes take the form of easements or the rights that certain parties have, such as a right of way (permission to enter another’s land), right to light, right of support, and so on. For more information, see Easements.
In the construction industry, it is most relevant in relation to planning. Planning permission is the legal process of determining whether proposed developments should be permitted, and it can present the greatest risk on a construction project.
Section 57 of the Town and Country Planning Act 1990 states that all developments fitting the description of such require planning permission. The developer has the responsibility for ensuring any necessary permissions and permits are in place before works begin.
However, development does not in all instances require planning permission. In England and Wales, the Town and Country Planning (General Permitted Development) Order 1995 enables central government to permit certain types of developments known as permitted developments. These are generally minor changes to existing properties. Permitted developments do not require approval from the local planning authority as permission is granted by the Order.
A Local Development Order, Neighbourhood Development Order or a Community Right to Build Order are other forms of permission that are granted.
A Development Consent Order (DCO) is the means of obtaining permission for developments categorised as Nationally Significant Infrastructure Projects (NSIP). This includes energy, transport, water and waste projects.
Other permissions or consents that may need to be obtained before carrying out development include:
- Works to protected trees.
- Advertisement consent.
- Listed building consent.
- Hazardous substances consent.
- Environmental permits/licences.
- Building regulations approval.
- Permit to work.
- Environmental consents.
- F10 notification.
- Party wall agreements.
For more information see: What approvals are needed before construction begins.
The Housing and Planning Bill 2015 included measures to introduce a 'permission in principle' (PiP) on land allocated for development in a qualifying document such as a brownfield register, development plan or neighbourhood plan. For more information, see Permission in principle.
Developments may not be used for purposes that are not within the use class for which they received planning permission. Planning permission is not needed to change the use of a development when the current use and the proposed use are within the same class. Changing the use of a development from one class to another may require planning permission, however, some changes are considered to be ‘permitted developments’ that are allowed without the need for a planning application.
For more information, see Change of use class.
[edit] Related articles on Designing Buildings Wiki
- Building regulations.
- How long does planning permission last.
- Material amendment to planning permission.
- Non-material amendment to planning permission.
- Permission for felling or lopping a tree
- Permission for mining or working of minerals
- Permission in principal
- Planning permission.
- Prior approval.
- Retrospective planning permission.
- Revocation of planning permission
- What approvals are needed before construction begins.
Featured articles and news
From the UKs largest manufacturer and supplier of lime.
From mud bricks to smart concrete
A brief history from 7000BC to a future on the moon.
Regulator of Social Housing publishes latest fire safety report
Covering remediation of 11 metre plus social housing sector buildings.
Apartment and Duplex Defects Remediation Bill 2024
Approved for priority drafting by Government of Ireland.
The long list with in the frame of key historical events.
Competence frameworks for sustainability in the built environment
Code of practice, core criteria consultation draft for comment.
UK Net Zero Carbon Buildings Standard Sept update
Pilot version for testing and feedback on its adoption due.
New Floods Resilience Taskforce
With a wet met office autumn prediction.
National Retrofit Hub takeover of Net Zero stage
At Birmingham UK Construction Week in October.
AT Awards 2024 finalists announced
With more to come, prior to the Awards ceremony in October.
London construction cools as hotspots appear nationally
Increases in the East of England, Yorkshire and Scotland.
ARB proposals for a new Architects Code
Announced in the shadow of the final Grenfell Inquiry report.
Combining human creativity and tech innovation now and in the future
Building automation and control systems market study
BSRIA 2024 North America BACS software & services.
Impact of digital technology on productivity in construction
New CIOB academy guidance for companies of all sizes.
Demolition and retrofit approaches in Planning Policy
MHCLG demolition and retrofit survey to inform future updates to national planning policy.
Expert taskforce to spearhead new, new town generation
Sir Michael Lyons given 12 months for recommendations.
Government policy statement on new towns
A coded vision for a new generation of new towns.