Blind arch
A blind arch is an arch that has been built within a wall and infilled, as opposed to traditional arches that are left open for use as passageways, windows, and so on. They can be built with solid infill as an intentional design aesthetic, or built as an open arch and infilled later. A blind arch can be used internally and externally, but is most commonly built into the external façade as a form of decoration, or in combination with functional archways which permit access or serve as windows.
Gothic and Romanesque Revival architecture commonly feature blind arches, most typically constructed from masonry or stone. They can also be found, in simulated form, in more modern light frame construction.
The term 'blind arcade' refers to a series of blind arches in a row.
The infill material is often the same as is used for the surrounding wall element. The thickness of the filled section can be the same or differ from that of the wall. A thinner infill can be used to provide the façade with depth and profile. A thicker infill may be found where the arch has been filled for security reasons, or to preserve a structure that is crumbling or otherwise defective.
Some blind arch designs include a rounded top positioned above a standard door or window-sized opening. Other designs, such as in Middle Eastern architecture, may be more ornate and elaborate, with pointed or peaked tops. In Islamic designs, a decorative element known as tracery often covers a blind arch. Tracery is formed by bands of material arranged over a blind arch to create intricate patterned designs.
[edit] Related articles on Designing Buildings
Featured articles and news
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).