BS 8414-1:2020
BS 8414-1:2020 - TC Fire performance of external cladding systems - Test method for non-loadbearing external cladding systems fixed to, and supported by, a masonry substrate. the latest update 2020, replaces the previous
BS 8414-1:2015 Fire performance of external cladding systems. Test method for non-loadbearing external cladding systems applied to the masonry face of a building published in 2015, was withdrawn in Apr 2015 and amended by BS 8414-1:2015+A1:2017 in June 2017. It can be used to test rainscreen cladding and external wall insulation systems.
BS 8414-2:2015 Fire performance of external cladding systems. Test method for non-loadbearing external cladding systems fixed to and supported by a structural steel frame was published in 2015, then amended in 2017 by BS 8414-2:2015+A1:2017. 2017 and withdrawn in April 2020.
The British Standards Institution (BSI) is the UK National Standards Body (NSB). It publishes standards and provides a range of books, self-assessment tools, conferences and training services. It also represents UK economic and social interests in European and international standards organisations. British Standard (BS) publications are technical specifications or practices that can be used as guidance for the production of a product, carrying out a process or providing a service.
see also BS 8414 Fire performance of external cladding systems
[edit] Related articles on Designing Buildings
- Automatic fire detection and alarm systems, an introductory guide to components and systems BR 510.
- ACM cladding.
- BR135: Annex B. Performance criteria and classification method for BS 8414-2:2005.
- BS 5839-1.
- BS 9999: Code of practice for fire safety in the design, management and use of buildings.
- Building Research Establishment.
- Celotex RS5000 PIR insulation.
- Cladding for buildings.
- Consultation opens for code of practice for fire risk appraisal and assessment of external wall construction.
- Desktop study.
- EWS1 forms not required for buildings without cladding.
- External fire spread, Supplementary guidance to BR 187 incorporating probabilistic and time-based approaches.
- External wall insulation.
- Fire at the Cube, Bolton.
- Fire performance of external thermal insulation for walls of multistorey buildings, third edition (BR 135).
- Fire safety design.
- Grenfell Tower fire.
- The Regulatory Reform (Fire Safety) Order 2005.
- Understanding the factors affecting flashover of a fire in modern buildings.
Featured articles and news
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on the changes via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.
A brief run down of changes intentions from April in an onwards.
Reslating an ancient water mill
A rare opportunity to record, study and repair early vernacular roofs.
CIOB Apprentice of the Year 2025/26
Construction apprentice from Lincoln Mia Owen wins this years title.
Insulation solutions with less waste for a circular economy
Rob Firman, Technical and Specification Manager, Polyfoam XPS explains.
Recycled waste plastic in construction
Hierarchy, prevention to disposal, plastic types and approaches.
UK Net Zero Carbon Buildings Standard V1 published
Free-to-access technical standard to enable robust proof of a decarbonising built environment.