User contributions
(Latest | Earliest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)
- 15:50, 27 October 2011 (diff | hist) N Cost consultant (Created page with "Typically cost consultants are quantity surveyors by profession, but accountants and other professionals may also be effective cost consultants. The cost consultant provides esti...")
- 15:48, 27 October 2011 (diff | hist) N Contract sum (Created page with "The contract sum is the price that the client has agreed to pay for the works described in the contract documents. The contract sum may be subject to adjustment under the terms...")
- 15:46, 27 October 2011 (diff | hist) Construction contract
- 15:35, 27 October 2011 (diff | hist) N Category:Procurement (Created page with "Category:Procedures") (top)
- 15:34, 27 October 2011 (diff | hist) N Contractor's proposals for building design and construction (Created page with "Contractors proposals are prepared by tenderers for design and build projects (or on a traditional contract where the contractor is to design discrete parts of the works) as a re...")
- 15:25, 27 October 2011 (diff | hist) N Contractor's master programme (Created page with "Contracts such as the the Joint Contracts Tribunal (JCT) Standard form of building contract require that the contractor produces for the contract administrator a contractor’s m...")
- 15:24, 27 October 2011 (diff | hist) N Construction contractor (Created page with "A contractor is appointed by the client to construct all or part of the project. Continuity of construction activity after the post war era of reconstruction in combination with ...")
- 15:20, 27 October 2011 (diff | hist) N Contract documents for construction (Created page with "On a traditional, fully-designed project, the contract documents may include: *Articles of agreement and conditions of contract for completing as a simple contract (or as a deed...")
- 15:13, 27 October 2011 (diff | hist) N Construction contract conditions (Created page with "Disputes procedure<br>Phased handover requirements<br>Information schedule (dates by which the Contractor needs certain sets of information)<br>Liquidated and ascertained damages...")
- 15:10, 27 October 2011 (diff | hist) N Contract administrator for construction contracts (Created page with "The contract administrator is the individual responsible for administering the construction contracts. The contract administrator is likely to be the architect, and indeed the JC...")
- 07:04, 27 October 2011 (diff | hist) Traditional contract: business justification
- 07:00, 27 October 2011 (diff | hist) Traditional contract: business justification
- 05:54, 27 October 2011 (diff | hist) Construction contract
- 05:38, 27 October 2011 (diff | hist) N Contingency plan (Created page with "Contingency plans are plans than could be enacted to mitigate project risks identified during risk assessment if those risks increase or actualise. Predictable risks that could...")
- 05:36, 27 October 2011 (diff | hist) N Contingencies in construction (Created page with "Contingencies are downside risk estimates generally applied to cost planning and timescales. Percentages applied are at their greatest in the concept stages of a project and are ...")
- 05:34, 27 October 2011 (diff | hist) N Consultation process (Created page with "This article refers to external consultation processes. For internal consultations see user panels and stakeholders. On large or sensitive projects it may be desirable to carry ...")
- 05:23, 27 October 2011 (diff | hist) N Consultant's proposals for design and construction (Created page with "A document requesting consultant's proposals sometimes called a 'request for proposals' should be collated and sent out to each prospective consultant listing the assumptions upo...")
- 05:20, 27 October 2011 (diff | hist) N Consultant team start-up meeting (Created page with "A consultant team start-up meeting should be chaired by the client and attended by the consultant team. It is an opportunity to agree working methods, along with means for report...")
- 05:17, 27 October 2011 (diff | hist) N Types of consultant in the construction industry (Created page with "Consultants may be appointed by the client to provide advise on the development of the project, to develop and co-ordinate the design, prepare production information and tender d...")
- 05:14, 27 October 2011 (diff | hist) N Construction stage report (Created page with "The construction stage report is prepared by the contract administrator at the end of the construction stage. It is the final construction progress report and as such may include...")
- 05:12, 27 October 2011 (diff | hist) Construction progress report
- 05:11, 27 October 2011 (diff | hist) N Construction progress report (Created page with "Construction progress reports are prepared regularly (often monthly) during the construction phase by the contract administrator and issued to the client. They will generally be ...")
- 05:08, 27 October 2011 (diff | hist) N Construction progress meeting (Created page with "During the construction stage the Contract Administrator holds regular (often monthly) construction progress meetings attended by the contractor and members of the Consultant Tea...")
- 05:04, 27 October 2011 (diff | hist) N CDM 2007 Construction phase plan (Created page with "Under the CDM regulations, the principal contractor is required to develop a construction phase plan setting out how health and safety will be managed during the construction pha...")
- 19:02, 26 October 2011 (diff | hist) N Construction manager (Created page with "See also Construction management / management contracting: outline work plan, available from the designing buildings wiki home page. Construction management is a procuremen...")
- 18:54, 26 October 2011 (diff | hist) Concept architectural design checklist
- 18:53, 26 October 2011 (diff | hist) Concept services design
- 18:52, 26 October 2011 (diff | hist) Concept structural design of buildings
- 18:51, 26 October 2011 (diff | hist) N Concept structural design of buildings (Created page with "Concept design proposals from the structural engineer might include: *Preferred foundation design. *Frame system. *Structural grid with column sizes. *Primary and secondary beam...")
- 18:48, 26 October 2011 (diff | hist) N Concept services design (Created page with "Concept design proposals from the services engineer might include: *Weights and location of all major plant and equipment. *Position of vertical service risers. *Routes for dist...")
- 18:46, 26 October 2011 (diff | hist) Concept design report
- 18:39, 26 October 2011 (diff | hist) N Concept design report (Created page with "The final output of the concept design stage is to produce a report which record the basic design concepts that might be options worth further investigation focusing on the major...")
- 18:34, 26 October 2011 (diff | hist) N Concept design (Created page with "NB for detailed tasks undertaken during the concept design stage see the free work plans available from the home page. Concept design is the first design stage. Feasibility stud...")
- 17:49, 26 October 2011 (diff | hist) Traditional contract: business justification
- 15:00, 26 October 2011 (diff | hist) N Category:Design (Created page with "Category:Design")
- 14:59, 26 October 2011 (diff | hist) N Concept architectural design checklist (Created page with "Concept architectural (as opposed to concept structural design or concept services design) design should take the development of the design to a level where it is suffi...")
- 14:50, 26 October 2011 (diff | hist) N Category:Planning permission (Created page with "Category:Regulations") (top)
- 14:49, 26 October 2011 (diff | hist) N Community infrastructure levy CIL (Created page with "In 2010 measures within the [http://www.legislation.gov.uk/ukdsi/2010/9780111492390/contents community infrastructure levy regulations ]came into force clarifying the relationshi...")
- 14:40, 26 October 2011 (diff | hist) N Commissioning building systems (Created page with "Commissioning refers to the process of bringing an item into operation and ensuring that it is in good working order. On building projects, this usually refers to building servic...")
- 14:35, 26 October 2011 (diff | hist) Collateral warranties for building design and construction
- 14:26, 26 October 2011 (diff | hist) Traditional contract: business justification
- 14:22, 26 October 2011 (diff | hist) N Collateral warranties for building design and construction (Created page with "#Collateral warranties are agreements associated with another 'primary' contract. They came into being as a result of the courts deciding that defects in buildings were not recov...")
- 14:18, 26 October 2011 (diff | hist) Traditional contract: business justification
- 14:16, 26 October 2011 (diff | hist) N Traditional contract: business justification (Created page with "NB there is no equivalent RIBA stage as business justification takes place before the appointment of an architect. The business justification stage is the first stage to take pl...")
- 13:59, 26 October 2011 (diff | hist) Arbitration in the construction industry
- 13:58, 26 October 2011 (diff | hist) Arbitration in the construction industry
- 13:57, 26 October 2011 (diff | hist) Adjudication in construction contracts
- 13:55, 26 October 2011 (diff | hist) Traditional contract: outline work plan
- 13:52, 26 October 2011 (diff | hist) Traditional contract: outline work plan
- 13:42, 26 October 2011 (diff | hist) Get started - top tips and help
(Latest | Earliest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)
IHBC NewsBlog
IHBC Membership Journal Context - Latest Issue on 'Hadrian's Wall' Published
The issue includes takes on the wall 'end-to-end' including 'the man who saved it'.
Heritage Building Retrofit Toolkit developed by City of London and Purcell
The toolkit is designed to provide clear and actionable guidance for owners, occupiers and caretakers of historic and listed buildings.
70 countries sign Declaration de Chaillot at Buildings & Climate Global Forum
The declaration is a foundational document enabling progress towards a ‘rapid, fair, and effective transition of the buildings sector’
Bookings open for IHBC Annual School 12-15 June 2024
Theme: Place and Building Care - Finance, Policy and People in Conservation Practice
Rare Sliding Canal Bridge in the UK gets a Major Update
A moveable rail bridge over the Stainforth and Keadby Canal in the Midlands in England has been completely overhauled.
'Restoration and Renewal: Developing the strategic case' Published
The House of Commons Library has published the research briefing, outlining the different options for the Palace of Westminster.
Brum’s Broad Street skyscraper plans approved with unusual rule for residents
A report by a council officer says that the development would provide for a mix of accommodation in a ‘high quality, secure environment...
English Housing Survey 2022 to 2023
Initial findings from the English Housing Survey 2022 to 2023 have been published.
Audit Wales research report: Sustainable development?
A new report from Audit Wales examines how Welsh Councils are supporting repurposing and regeneration of vacant properties and brownfield sites.
New Guidance Launched on ‘Understanding Special Historic Interest in Listing’
Historic England (HE) has published this guidance to help people better understand special historic interest, one of the two main criteria used to decide whether a building can be listed or not.