Uninterrupted power supply for buildings
An uninterrupted power supply (UPS), sometimes referred to as an uninterruptible, or uninterruptable power supply, provides an alternative ‘no-break’ electrical supply that can be required in situations where it is important there is no loss of electrical supply, even if the primary supply fails.
Typically this is necessary where a loss of power could result in a risk to health or disruption to business, for example:
- Emergency services and medical facilities.
- Leisure and sports venues where scheduled and ticketed events take place.
- Data centres.
- Financial services.
- Some industrial processes.
It might also be necessary to support specific critical services, such as:
- Information and communications technology (ICT).
- Emergency lighting.
- Fire alarms and other safety systems.
UPS can be also be useful when the primary power source is shut down intentionally, for example during maintenance, and some systems can correct power supply issues such as voltage spikes.
A UPS is not the same as an auxiliary, standby or emergency power supply as it provides virtually instantaneous supply, avoiding any power interruption.
Generally this will include the use of batteries, supercapacitors, or flywheels (rotary UPS) that either allow equipment to be powered down safely when the mains supply is interrupted, or provide power for long enough for an auxiliary supply to come online. This may only take a few minutes.
Auxiliary power might be provided by:
- Simple packaged battery units that can be incorporated into equipment such as comms cabinets.
- Stand-alone battery units.
- Standby generators.
They might be very small units that supply a single computer, to large installations that supply a major industrial process.
UPS systems will generally include some form of automatic mains failure detection (AMF) and an automated changeover process. They may also detect power restoration and automatically revert to the mains supply.
If continued power supply is critical, the UPS may be provided by a number of smaller packaged units, rather than by a single source, which might introduce a potential source of failure itself. The packaged units might include some ‘redundancy’ so that if one or more of the units fail, there is still adequate supply.
UPS require careful design, particularly where they are supplying critical systems. Regular maintenance is necessary to ensure continued performance.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).
Comments