Hardcore
The term 'hardcore' refers to the mass of solid materials used as a make up, formation material to raise levels, fill irregularities in excavations and create a firm and level working base onto which heavy load-bearing surfaces such as stone or concrete can be laid. The hardcore then helps evenly spread imposed loads.
Hardcore may be used in the formation of roads, paving, driveways, foundations, ground floor slabs, and so on. It may also be used on its own to form a temporary road surface on construction sites.
A variety of graded materials can be used to make up a hardcore layer:
- Construction waste such as brick and broken tiles.
- Gravel.
- Quarry waste.
- Crushed rock.
- Clean, graded concrete rubble.
- Blast furnace slag.
- Colliery spoil.
- Oil shale residue.
- Pulverized-fuel ash.
Materials need to be sufficiently hard as well as being capable of being compressed (rammed to form a compact base) before the upper layer is added. This removes gaps or voids which could otherwise threaten the supportive properties of the hardcore layer.
They should also be resistant to deterioration, chemically inert, should not be absorbent and should not be affected by the presence of water (for example, colliery shale expands when moist).
Quarry waste is a good source of hardcore material, although care should be taken not to include waste from gypsum mines. This is because such waste often contains a mixture of limestone and gypsum which can attack concrete. Similarly, concrete rubble may lead to a risk of sulphate attack if it contains gypsum plaster. Construction waste can contain timber which may deteriorate and can spread rot. Substances such as colliery spoil may contain soluble sulphate which, if it reacts with water, can infiltrate and damage cement.
The type of construction, expected load and probable stresses will determine the appropriate thickness of the hardcore layer that must be used. Typically it is laid in well-compacted layers of 100-150 mm.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.
The Master Builder: William Butterfield and his times. Book review.
Why construction can't afford to ignore the skills gap.
Building Safety Regulator, 19 August
Gill Kernick appointed Independent Chair of Residents’ Panel.
Connecting knowledge, technology and conservation
Building competence for the future of built heritage.
Building Regulations and Building Safety Act
CIOB publishes free advice for non-domestic clients.
Building Safety Newsletter from MHCLG.


















Comments
Hard core layer should be laid on a well compacted base of either laterite or coarse sand. Depending on the size of aggregate used, compressibility may be impossible if larger aggregates is used; such layers cannot settle since the base is compacted to the highest possible density.