What to do before you hire a skip
Contents |
[edit] Introduction
When you hire a skip aim for one that’s slightly too big for your requirements. This could save you a lot of time, energy and money in the long run. Because it’s all too easy to underestimate how much waste your project’s going to create. And if your skip is too small, you’ll have no choice but to hire a second one.
Also, it’s important to note that when loading, remember that your skip can only be filled level to the top – suppliers face prosecution for unsafe or overweight loads.
Finally, check your gates are wide enough to allow the skip lorry through if you’re using it off road. The skip might fit fine but remember the skip lorry is wider.
[edit] Where should I put the skip?
You are free to put your skip anywhere on your private property, provided the driver can access the location but you should be certain of where you want it. For your convenience choose a space big enough and close enough to the site you’re emptying but easy for the driver to access it.
There are a couple of things to remember:
- Don’t put your skip over any utility access points.
- Be aware of any overhead cables or overhanging trees and inform the skip lorry driver of any issues.
- Give the skip lorry driver clear instructions when they arrive at your premises.
- Once the skip has been placed it should not be moved, otherwise it might become inaccessible for the driver.
[edit] Do I need a permit if I want to hire a skip?
If you’re planning on putting the skip on a public road you’ll need a skip permit.
Before your skip is delivered, a skip permit will need to be in place. If not then you could be fined. Skip permits are issued by your local council. Depending on the council, applications for skip permits are made by you or the company providing the skip.
It normally takes at least a few days to arrange a skip permit, so allow for this in your planning. When you arrange to hire a skip confirm with the company whether they organise the permit or you do.
[edit] How long do you need to hire a skip for?
This really comes down to how much waste you have, how close you can get the skip to the site you are working at and how many people are helping to load the skip.
Make sure you are clear with your skip hire company about how long you will need it, because you don’t want your skip being removed too soon. On the other hand, remember that more days typically cost more money, so it may be more cost effective to get some help loading the waste to reduce the time you hire it for.
Equally, if it’s important the skip is removed from your property before a certain date, especially if you needed a permit because it is on a public land. Make sure that you get a clear commitment from the company you hire a skip from about when they will remove it.
[edit] Related articles on Designing Buildings
Featured articles and news
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).
Ebenezer Howard: inventor of the garden city. Book review.
The Grenfell Tower fire, eight years on
A time to pause and reflect as Dubai tower block fire reported just before anniversary.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.
Construction contract awards hit lowest point of 2025
Plummeting for second consecutive month, intensifying concerns for housing and infrastructure goals.
Understanding Mental Health in the Built Environment 2025
Examining the state of mental health in construction, shedding light on levels of stress, anxiety and depression.