Tree rights
Trees have often been the cause of disputes between neighbours. A summary of some of the rights and remedies relating to trees is presented below.
Contents |
[edit] Branches and roots
- The owner of a property has the right to lop off any branches that overhang their property. They do not have the right to take preventive action by cutting back a neighbour’s tree before it overhangs their property. Any lopped branches must be returned to the neighbour.
- Fruit on overhanging branches belongs to the person who owns the tree and strictly speaking in law should be returned to the owner.
- The same legal right in respect of overhanging branches is applicable to tree roots on a neighbour's land.
- In the case of a dispute, the Access to Neighbouring Land Act allows a party to apply to the courts for consent to access neighbouring property to carry out essential maintenance.
- There is no right to a view (although it is possible that a restrictive covenant against ‘annoyance’ can be used to protect a view) although there can be a prescriptive right to light (the right to receive sufficient light through an opening such as a window, to allow ordinary comfortable use and enjoyment of a dwelling, or ordinary beneficial use and occupation of other buildings), see: Right to light for more information.
- There is no right to top a neighbour’s trees or hedges other than any elements that overhang neighbouring property.
NB Some trees are protected by tree preservation orders (TPO's). The principal effect of a TPO is to prohibit the cutting down, uprooting, topping, lopping, uprooting, willful damage to or willful destruction of protected trees or woodlands. This applies to roots as well as stems and branches. The local authority should keep a register of TPO's. See Tree preservation orders for more information.
[edit] Subsidence
- Mature trees take up 4,000 litres of groundwater a day in the summer, and tree roots can spread out to a distance equal to the height of the tree. Consequently a situation can occur where neighbouring buildings suffer subsidence. A house owner can bring a successful court action against a neighbour if the cause of the subsidence can be proven to be caused by a neighbour's tree.
[edit] Public rights of way
- The owner of land that is designated a public footpath or bridleway has a legal responsibility to keep the full access clear of trees, shrubs and obstructive vegetation.
[edit] Related articles on Designing Buildings
- A guide to the use of urban timber FB 50.
- Chain of custody.
- Conservation area.
- Definition of tree for planning purposes.
- Easements.
- Forests.
- Forest ownership.
- Green belt.
- Ground heave.
- Listed buildings.
- Neighbour dispute.
- Permission for felling or lopping a tree.
- Restrictive covenants.
- Right to light.
- Rights of way.
- Sites of Special Scientific Interest.
- Timber.
- Tree dripline.
- Tree preservation orders.
- Tree root subsidence.
- Trees in conservation areas.
- Urban trees.
[edit] External references
- Access to Neighbouring Land Act.
- Practical Law: Restrictive covenant - interference with view?
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.






















