Contents |
[edit] Use of the term
The term structural opening (SO), sometimes also called rough opening, refers to the size of an opening in a wall or facade where a window or door or other unit will be installed. It is normally slightly larger than the actual unit size to allow for tolerances in construction. Structural openings are called this such because their edges generally meet with structural elements of the building such as columns, walls, beams, lintels and so on.
[edit] Finished opening
The term finished opening (FO) is similar to structural opening in that it is the opening that will house a unit such as a window in a facade or wall. Although in this case the opening may have been prepared in some way rather than being a raw structural opening, for instance with fixing of plywood boxing, plaster or render between the structural element and the location of the window or other unit.
[edit] Tolerances
The width of a structural opening to the edge of brick and blockwork might be 910mm, the finished opening may have a lining of 10mm creating a finished opening that is 900mm wide, whilst the unit size that is intended to be installed is 890mm wide, leaving <5mm tolerance on all sides.
NHBC guidance 9.1.4 Doors and windows discusses appropriate tolerances of <3mm on one side to the other of an opening: "Doors and windows shall be installed to appropriate tolerances, including openings in walls and external openings viewed from the inside."
[edit] Thermal performance
It should be noted that a window or any unit installed into a structure can have an impact on fabric performance, as the opening punctuates the building fabric from inside to outside. Psi ( or ψ value) denotes heat loss over a given length rather than a given area. The thermal performance of a window should be calculated including an adjustment for the interface between the window unit and the structural or finished opening, this installation adjustment is often known as the window or installation Psi (ψw). It is an adjustment to the thermal performance of a window allowing for heat loss along the linear junction between the installed window and the edge of the opening.
[edit] Related articles on Designing Buildings
- Elements of structure in buildings
- Principles of enclosure.
- Structure.
- Structural systems.
- Superstructure.
- Types of structure.
- Types of door.
- Windows.
[edit] External references
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.