Receptor
A ‘receptor’ is a component of the natural or built environment (such as a human being, water, air, a building or a plant) that is affected by an impact of construction works and/or the operation of a proposed development.
Air quality sensitive receptors are people, property, species or designated sites for nature conservation that may be at risk from exposure to air pollutants potentially arising as a result of a proposed development.
Ref The HS2 London-West Midlands Environmental Statement, Glossary of terms and list of abbreviations, DETR 2013.
NB Culvert, screen and outfall manual, (CIRIA C786) published by CIRIA in 2019, defines a receptor as: ‘The entity, such as a person, property or habitat, which may be harmed by an event via a source and pathway. The vulnerability of a receptor can be reduced by increasing resilience.’
Guidance on the code of practice for property flood resilience, published by CIRIA in 2021, defines a receptor as: ‘The entity that may be harmed by a particular hazard (eg a person, property, habitat). For example, in the event of heavy rainfall (source) floodwater may propagate across the flood plain (pathway) and inundate a buildings (receptor) that may suffer material damage (the harm or consequence).’
[edit] Related articles on Designing Buildings Wiki
- Stakeholder.
- Early BREEAM stakeholder engagement.
- Community engagement in conservation.
- Consultation process.
- Interface risk in construction.
- Non-statutory consultees.
- Stakeholder map.
- Stakeholder management.
- Statutory authorities.
- Third party dependencies.
- User panels.
- Environmental impact assessment EIA.
- Ecological Impact Assessment EcIA.
- Regulatory Impact Assessment.
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.