Preliminary contracts in the construction industry
In law, a preliminary contract typically aims to prevent the parties to a contract from entering (at a later stage) into a similar legal arrangement with third parties. In order to confirm that that they will not do so, parties will sign a preliminary contract.
Preliminary contracts are more common in Europe when buying land or property, especially when reserving property off-plan. Buying off-plan can be an uncertain process as a buyer commits to a property purely on the basis of drawings (plans) before any construction has taken place.
Preliminary contracts serve as a formal confirmation of reservation and may have more legal power than a deposit on its own. But they are formulated to secure the commitment of buyers rather than compelling developers to stick to their side of the bargain. Furthermore, a preliminary contract may not compel a developer to sell the property that is the subject of the contract.
Prior to signing the preliminary contract, potential buyers are advised to check how far the development has progressed and whether the developer or contractor is still in a position to start construction work. A further point to note is whether the work (if started) is in accordance with the plans. Some large developers can provide buyers with a degree of certainty but this may not be the case with all developers.
Preliminary contracts can be useful to potential buyers but they are not a full confirmation of the right to get what has been reserved.
NB The term 'preliminary contract' may also be used to refer to a contract for preliminary works, such as site preparation, setting out, construction of access roads and so on.
[edit] Related articles on Designing Buildings Wiki
- Agreement.
- Bespoke construction contract
- Construction contract conditions
- Contract documents for construction
- Contractual obligation.
- Contractual right.
- Core clause.
- Intermediate building contract
- JCT
- JCT Construction management contract
- Letter of intent.
- Lump sum contract
- NEC3
- Standard form of contract
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.