Drenchers
Drenchers are a system of water heads that are used for the fire protection. In contrast to sprinklers which are found internally, drenchers are normally found on the exterior of a building to protect against a fire from a neighbouring building. They tend to be positioned on roofs and over windows and external openings.
Another difference between sprinklers and drenchers is that all nozzles in the drencher system are activated simultaneously, whereas individual nozzles in a sprinkler system open when activated.
A drencher system consists of the follows components:
- Water source.
- Pump unit.
- Distribution piping.
- Control fittings.
- Alarm device.
- Special nozzles or water head.
The water heads are like those of sprinklers and may be sealed or unsealed.
The three main types of drenchers are:
- Roof drenchers: Positioned on the roof ridge and throw a curtain of water upwards.
- Wall or curtain drenchers: Throw a curtain of water over openings or portions of a building most likely to admit fire.
- Window drenchers: Positioned horizontally level with the top of a window so as to protect the opening.
[edit] Related articles on Designing Buildings Wiki
- Business Sprinkler Alliance.
- Case study A for offices to show where automatic sprinklers have the greatest impact.
- Design benefits of automatic sprinkler systems granted under approved document B.
- External fire spread, Supplementary guidance to BR 187 incorporating probabilistic and time-based approaches.
- Fire detection and alarm system.
- Fire in buildings.
- Fire safety design.
- Making the case for sprinklers and dispelling myths.
- Sprinkler.
- Sprinkler head.
- The impact of automatic sprinklers on building design.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.
New and updated CLC building safety guidance.

















Comments