Scoping study for environmental impact assessment
A scoping study (sometimes called a scoping opinion) is the process of determining the content of an environmental impact assessment where an environmental impact assessment is required as part of a planning application.
Broadly, environmental impact assessments are required for development described in schedule 1 and schedule 2 of The Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations. This includes projects such as:
- Power stations, refineries, certain industrial processes, certain transport projects, dams pipelines and airports.
- Major projects (above certain thresholds) described in the schedules of the regulations.
- Developments in sensitive or vulnerable locations (thresholds do not apply in sensitive locations such as national parks or national nature reserves where every project must be screened for environmental impact assessment).
- Unusually complex projects that may have adverse environmental effects.
See Environmental Impact Assessment for more information.
The local planning authority must provide a scoping opinion if requested by a developer. The scoping opinion should identify the content and extent of the information to be included in an environmental impact assessment. Scoping is not mandatory, but it is considered to be an important part of preparing an environmental impact assessment as it ensures that the assessment focuses on the key issues.
A request for a scoping study should include:
- A plan identifying the land.
- A description of the development.
- A description of the possible effects of the development on the environment.
- Other relevant information.
The local planning authority should adopt a scoping opinion within five weeks of receiving the request, or within five weeks of adopting a screening opinion if one was requested at the same time. If the local planning authority fails to adopt a scoping opinion, or if the applicant disagrees with the opinion, they may appeal to the Secretary of State who will then make a scoping direction.
NB In April 2015, the Town and Country Planning (Environmental Impact Assessments)(Amendment) Regulations 2015 came into effect, raising the threshold above which a screening decision is required to determine whether an environmental statement is necessary, as set out in the Town and Country Planning (Environmental Impact Assessment) Regulations 2011. Controversially, this raised the threshold for industrial estates, residential developments and other urban developments from 0.5 hectares to five hectares (or 150 units for residential developments).
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.