Scope 1 carbon emissions
Contents |
[edit] Scope in terms of carbon emissions
The Green House Gas Protocol Corporate Standard classifies GHG emissions into three ‘scopes’.
Scope 1 emissions are direct emissions from owned or controlled sources. Scope 2 emissions are indirect emissions from the generation of purchased energy. Scope 3 emissions are all indirect emissions (not included in scope 2) that occur in the value chain of the reporting company, including both upstream and downstream emission
[edit] What are scope 1 site emissions ?
Scope 1 emissions include direct emissions used on-site such as natural gas and fuel, refrigerants, and emissions from combustion in owned or controlled boilers. So these will differ if measuring emissions from a construction site itself, measuring emissions from a building (once complete) or from the companies involved in the project. It does also include emissions from fleets of vehicles (e. g. cars, vans, trucks, lorries etc).
Thus scope 1 emissions would encompass process emissions that are released during industrial processes, if this is on-site manufacturing, id off-site it is more likely to become scope 2 or 3 emissions.
[edit] What are indirect emissions ?
The GHG Protocol defines indirect emissions as “a consequence of the activities from the reporting company but occur at sources owned or controlled by another company.” unlike direct emissions, so these include Scope 2 and Scope 3 emissions. but the protocol makes a clear distinction between the two categories.
[edit] Related articles on Designing Buildings
- Carbon terminology.
- Greenhouse gases.
- ISO 14001:2004 Environmental management system -- Requirements with guidance for use.
- Life cycle assessment.
- PAS 2060.
- PAS 2080 Carbon management in Infrastructure.
- Scope 2 carbon emissions.
- Scope 3 carbon emissions.
- The Carbon Project: improving carbon emission data.
[edit] External links
Featured articles and news
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.