Richmond Villages Retirement Complex, Aston on Trent
Fassa Bortolo is the supplier of the external wall insulation for the façade of this project to the contractor, Complete Rendering Solutions. The first phase is now finished and the next starts in early October 2017. The whole project will take two years to complete.
The ETICS chosen for the ground floor was Fassatherm® Classic using 50mm thick GEPS panels. These are fire retardant and graded 70 E for fire resistance purposes. A96, a cement based adhesive and base coat for reinforcement of the insulation panels was used to fix them to the underlying blockwork. The adhesive which can be machine applied, has a thermal rating of 0.75 W/mK. Cuts were made into the EPS insulation to make it resemble ashlar and give an overall stone effect and it was then covered with a base coat of A96 and a reinforcing mesh.
One aspect of installing an ETICS at ground level or below is the importance of not breaching the damp proof course. Here Basetherm extruded polystyrene panels which are moulded to improve resistance to water absorption were used below the damp proof course, and Basecoll which works as a waterproofing adhesive and base coat was applied to glue and smooth them off.
On the first floor, KI 7, a fibre reinforced lime and cement base coat was applied directly to masonry blockwork. This render waterproofs the wall and acts as a foundation for the subsequent finishing coat.
A coat of RX 561 was then applied to the whole façade. This rustic acrylic siloxane finish coat render is excellent at repelling water but still has good breathability and helps reduce mould and algae. The client chose to have a light cream tint from the vast array of colours available from the Fassa Bortolo Colour System.
--Fassa 14:23, 08 Aug 2017 (BST)
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.