Richmond Villages Retirement Complex, Aston on Trent
Fassa Bortolo is the supplier of the external wall insulation for the façade of this project to the contractor, Complete Rendering Solutions. The first phase is now finished and the next starts in early October 2017. The whole project will take two years to complete.
The ETICS chosen for the ground floor was Fassatherm® Classic using 50mm thick GEPS panels. These are fire retardant and graded 70 E for fire resistance purposes. A96, a cement based adhesive and base coat for reinforcement of the insulation panels was used to fix them to the underlying blockwork. The adhesive which can be machine applied, has a thermal rating of 0.75 W/mK. Cuts were made into the EPS insulation to make it resemble ashlar and give an overall stone effect and it was then covered with a base coat of A96 and a reinforcing mesh.
One aspect of installing an ETICS at ground level or below is the importance of not breaching the damp proof course. Here Basetherm extruded polystyrene panels which are moulded to improve resistance to water absorption were used below the damp proof course, and Basecoll which works as a waterproofing adhesive and base coat was applied to glue and smooth them off.
On the first floor, KI 7, a fibre reinforced lime and cement base coat was applied directly to masonry blockwork. This render waterproofs the wall and acts as a foundation for the subsequent finishing coat.
A coat of RX 561 was then applied to the whole façade. This rustic acrylic siloxane finish coat render is excellent at repelling water but still has good breathability and helps reduce mould and algae. The client chose to have a light cream tint from the vast array of colours available from the Fassa Bortolo Colour System.
--Fassa 14:23, 08 Aug 2017 (BST)
Featured articles and news
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.