Project roles table
A project roles table is a planning tool that is included as part of the RIBA Plan of Work Toolbox. It takes the form of a table that sets out the roles required on a project as well as defining the stages during which those roles are required and the parties responsible for carrying out the roles. Ref https://www.ribaplanofwork.com/Help/Glossary.aspx
It is often used in association with a design responsibility matrix which sets out responsibility for each element of the design at each stage of the design development process and to what level of detail. For more information, see Design responsibility matrix.
A project roles table might also be accompanied by a contractual tree, illustrating the contractual relationship between the participants in the project. For more information, see Contractual tree.
A project roles table typically takes the form of a bar chart with the various project roles listed on the y-axis and the numbered projects stages on the x-axis. A bar extends along the x-axis to represent the stages of work that the particular role is responsible for.
Alternatively, it can take the form of a table which uses a RACI matrix. This is a form of form of responsibility assignment matrix (RAM) that can be used to help systematically manage a process or project. RACI sets out for each activity at each stage whether the various parties on the project are Responsible, Accountable, should be Consulted, or just kept Informed. For more information see: RACI matrix.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.