Pre design studies
The design process is generally considered to begin at the concept design stage.
It is preceded by a host of non-design activities, such as business justification, brief development, feasibility studies and options appraisals, and it is followed by design development, technical design, procurement, construction and handover and close out.
Whilst pre-design studies such as feasibility studies and options appraisals may include the prepration of diagrams to assess whether a potential site or building type is possible given the project parameters and constraints, they are not designs. They are intended only to help identify the client's requirements, establish that those requirements are feasible and determine whether the project should proceed in a particular direction.
The concept design represents the design team's initial response to the project brief, and the concept design stage is generally considered to be the most creative stage of a project's development .
For more information see:
- Business justification
- Brief development
- Feasibility studies
- Options appraisals
- Concept design
- Design development
- Technical design
- Procurement
- Construction
- Handover and close out.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A transformative shift in the design, construction and management of built assets.
Apprenticeship announcement by the Prime Minister
Welcomed but with call for more actionable detail.
Heat pump announcements, what homeowners need to know
An 'ultimate guide to heat pumps' from a heating company.
Construction contract awards reach 7.1bn in February
Their highest level in seven months.
The journey to sustainability in heritage
Research is the key to better understanding.
Heritage approaches to adaptation, mitigation and loss.
Bridging the gap between policy, finance and installation.
Development on brownfield land
Definition, background, policy and the latest consultation.
With the Design Framework for Building Services.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, measures and the roles involved.
ECA joins HSE campaign to support mental health
Working Minds’ five simple steps based on risk assessment.
Mental health in the construction industry
Mental health issues in brief with related articles.
Transitional arrangements, Building Control and the BSR.
For pre-October buildings with substantial progress by April.
Why quality counts in domestic ventilation systems
From products, to systems to the installation.
Empowering the Future with CIOB Academy
Lifelong learning, upscaling, and reskilling for the built environment.