Pre design studies
The design process is generally considered to begin at the concept design stage.
It is preceded by a host of non-design activities, such as business justification, brief development, feasibility studies and options appraisals, and it is followed by design development, technical design, procurement, construction and handover and close out.
Whilst pre-design studies such as feasibility studies and options appraisals may include the prepration of diagrams to assess whether a potential site or building type is possible given the project parameters and constraints, they are not designs. They are intended only to help identify the client's requirements, establish that those requirements are feasible and determine whether the project should proceed in a particular direction.
The concept design represents the design team's initial response to the project brief, and the concept design stage is generally considered to be the most creative stage of a project's development .
For more information see:
- Business justification
- Brief development
- Feasibility studies
- Options appraisals
- Concept design
- Design development
- Technical design
- Procurement
- Construction
- Handover and close out.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.