Pre design studies
The design process is generally considered to begin at the concept design stage.
It is preceded by a host of non-design activities, such as business justification, brief development, feasibility studies and options appraisals, and it is followed by design development, technical design, procurement, construction and handover and close out.
Whilst pre-design studies such as feasibility studies and options appraisals may include the prepration of diagrams to assess whether a potential site or building type is possible given the project parameters and constraints, they are not designs. They are intended only to help identify the client's requirements, establish that those requirements are feasible and determine whether the project should proceed in a particular direction.
The concept design represents the design team's initial response to the project brief, and the concept design stage is generally considered to be the most creative stage of a project's development .
For more information see:
- Business justification
- Brief development
- Feasibility studies
- Options appraisals
- Concept design
- Design development
- Technical design
- Procurement
- Construction
- Handover and close out.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.