Partition permanence and leases
Commercial leases normally contain a provision that if a tenant wishes to break the lease, they must remove all their property (chattels in legal parlance) from the let premises. Such provisions will often, but not always, require the removal of any alterations made to the property with the agreement of the landlord, other than any the landlord accepts need not be removed.
It could be thought that in this context, the word ‘chattels' means only non-fixed items. However, the case of Riverside Park Ltd. v NHS Property Services Ltd. (2016) shows the potential downside of failing to fully understand the implications of definitions in a lease when the time comes for it to be terminated.
The case involved a tenant which decided to break its lease on the fifth anniversary of it being granted, as was permitted under the lease terms. The tenant gave the required break notice to the landlord and largely cleared its property from the premises. The lease contained a provision that a break notice would not be valid unless the tenant gave the landlord vacant possession of the premises on or before the ‘break date’ in the lease.
However, the tenant had installed partitioning, which was demountable, and this was not removed. Nor were various other works which the tenant had undertaken to the premises during its tenancy, such as the installation of kitchen units, water pipes and an alarm system.
The landlord argued that the goods left behind were the chattels of the tenant and the break notice was therefore invalid. The tenant argued that it had only left fixtures and fittings and the notice was therefore valid as vacant possession had been given. The landlord did not agree with the tenant's interpretation as regards the need not to remove fixtures and fittings, but in the event that dispute was not important.
The High Court considered that the partitioning was for the tenant's benefit only and not intended to give any lasting value to the property. Accordingly, it was a chattel. It was significant and interfered with the landlord's right to vacant possession. As a result, the break notice was invalid.
The result for the tenant, as well as having to pay its own and the landlord's legal costs, is an obligation to pay the rent due until the next break date, or to negotiate an earlier exit with the landlord.
Of all the clauses in a lease, those concerning its termination are often the most perilous and should be fully understood and complied with.
This article was originally published by Rex Cowell here.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.
























