Commercial leases normally contain a provision that if a tenant wishes to break the lease, they must remove all their property (chattels in legal parlance) from the let premises. Such provisions will often, but not always, require the removal of any alterations made to the property with the agreement of the landlord, other than any the landlord accepts need not be removed.
It could be thought that in this context, the word ‘chattels' means only non-fixed items. However, the case of Riverside Park Ltd. v NHS Property Services Ltd. (2016) shows the potential downside of failing to fully understand the implications of definitions in a lease when the time comes for it to be terminated.
The case involved a tenant which decided to break its lease on the fifth anniversary of it being granted, as was permitted under the lease terms. The tenant gave the required break notice to the landlord and largely cleared its property from the premises. The lease contained a provision that a break notice would not be valid unless the tenant gave the landlord vacant possession of the premises on or before the ‘break date’ in the lease.
However, the tenant had installed partitioning, which was demountable, and this was not removed. Nor were various other works which the tenant had undertaken to the premises during its tenancy, such as the installation of kitchen units, water pipes and an alarm system.
The landlord argued that the goods left behind were the chattels of the tenant and the break notice was therefore invalid. The tenant argued that it had only left fixtures and fittings and the notice was therefore valid as vacant possession had been given. The landlord did not agree with the tenant's interpretation as regards the need not to remove fixtures and fittings, but in the event that dispute was not important.
The High Court considered that the partitioning was for the tenant's benefit only and not intended to give any lasting value to the property. Accordingly, it was a chattel. It was significant and interfered with the landlord's right to vacant possession. As a result, the break notice was invalid.
The result for the tenant, as well as having to pay its own and the landlord's legal costs, is an obligation to pay the rent due until the next break date, or to negotiate an earlier exit with the landlord.
Of all the clauses in a lease, those concerning its termination are often the most perilous and should be fully understood and complied with.
This article was originally published by Rex Cowell here.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
AI and the challenges to intellectual property
The legal landscape of adopting AI now and in the future.
Worrying landscape for Welsh construction SMEs revealed.
In recent risk factor analysis report completed by CIOB.
Construction Sport survey highlights risks of dehydration
Supporting construction workers to avoid dangers.
Can your business afford to ignore mental well-being?
£70 - 100 billion annually in UK construction sector.
Mental health in the construction industry
World Mental Health Day 10 October.
Construction awards provide relief in wake of ISG collapse
Spike in major infrastructure awards, housing up but short of targets, are ISG collapse impacts yet to come.
Biodiversity net gain with related updates and terms
Only 0.5% of applications subject to BNG in the context significant proposed changes to planning.
As political power has shifted from blue to red
Has planning now moved from brown to green?
The role of construction in tackling the biodiversity crisis
New CIOB Nature of Building digital series available now.
The Nature Towns and Cities initiative
Grants of up to 1 million for local councils and partners.
The continued ISG fall out October updates
Where to look for answers to frequently asked questions.
Building safety remediation programme for Wales
With 2024 October progress updates.
In major support package for small businesses.
Conservation and transformation
Reading Ruskin’s cultural heritage. Book review.
Renovating Union Chain Bridge.
AI tools for planning, design, construction and management
A long, continually expanding list, any more to add?