Partition permanence and leases
Commercial leases normally contain a provision that if a tenant wishes to break the lease, they must remove all their property (chattels in legal parlance) from the let premises. Such provisions will often, but not always, require the removal of any alterations made to the property with the agreement of the landlord, other than any the landlord accepts need not be removed.
It could be thought that in this context, the word ‘chattels' means only non-fixed items. However, the case of Riverside Park Ltd. v NHS Property Services Ltd. (2016) shows the potential downside of failing to fully understand the implications of definitions in a lease when the time comes for it to be terminated.
The case involved a tenant which decided to break its lease on the fifth anniversary of it being granted, as was permitted under the lease terms. The tenant gave the required break notice to the landlord and largely cleared its property from the premises. The lease contained a provision that a break notice would not be valid unless the tenant gave the landlord vacant possession of the premises on or before the ‘break date’ in the lease.
However, the tenant had installed partitioning, which was demountable, and this was not removed. Nor were various other works which the tenant had undertaken to the premises during its tenancy, such as the installation of kitchen units, water pipes and an alarm system.
The landlord argued that the goods left behind were the chattels of the tenant and the break notice was therefore invalid. The tenant argued that it had only left fixtures and fittings and the notice was therefore valid as vacant possession had been given. The landlord did not agree with the tenant's interpretation as regards the need not to remove fixtures and fittings, but in the event that dispute was not important.
The High Court considered that the partitioning was for the tenant's benefit only and not intended to give any lasting value to the property. Accordingly, it was a chattel. It was significant and interfered with the landlord's right to vacant possession. As a result, the break notice was invalid.
The result for the tenant, as well as having to pay its own and the landlord's legal costs, is an obligation to pay the rent due until the next break date, or to negotiate an earlier exit with the landlord.
Of all the clauses in a lease, those concerning its termination are often the most perilous and should be fully understood and complied with.
This article was originally published by Rex Cowell here.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.