Property disrepair and landlord liabilities
In July 2016, in a decision of importance to landlords and tenants, the Supreme Court ruled that property owners cannot be held liable for the consequences of disrepair of which they have not been notified.
The case - Edwards v Kumarasamy - concerned an accident in which the sub tenant of a flat was injured when he tripped over an uneven paving stone on the pathway leading up to the front door of the block where the flat was located. The sub tenancy conferred on him a right to use common parts of the block and he launched a compensation claim against the long leaseholder of the flat.
He was awarded £3,750 in damages by a judge, whose decision was later approved by the Court of Appeal. However, in unanimously upholding the leaseholder’s challenge to that ruling, the Supreme Court found that he had wrongly been held responsible for a defect in the pathway of which he had no notice.
The leaseholder was not in possession of the pathway and any obligation to repair it would only have been triggered once he had notice of the disrepair. By entering into the sub tenancy, he had effectively lost the right to use the common parts and the subtenant was in any event in the best position to spot the uneven paving stone due to his frequent use of the pathway.
The subtenant had also argued that the leaseholder was, by operation of Section 11 of the Landlord and Tenant Act 1985, under an implied duty to maintain the structure and exterior of the block. However, the Court found that, as a matter of ordinary language, the pathway could not be viewed as part of the exterior of the front hall of the building.
[edit] Related articles on Designing Buildings
- 2021 PRS electrical safety standards.
- Calculating compensation for property damage.
- Cost recovery clauses.
- Defective premises and freeholder liabilities.
- Dilapidations.
- Electrical safety in the private rented sector.
- Energy efficiency regulations: The challenges for landlords.
- Failure to mention asbestos.
- Failure to notify tenant.
- Homes (Fitness for Human Habitation) Act 2018.
- Licence for Alterations for Apartment.
- Licence to alter.
- Material non-disclosure.
- Misrepresentation and insurance.
- Repairs and optional improvements.
- Schedule of condition.
- Tree root subsidence.
- When is a commercial lease surrendered?
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.