A recent case decided by the High Court will (if not overturned on appeal) have potential implications for some commercial tenants seeking renewals of their tenancies.
The case of S Franses Ltd. v The Cavendish Hotel (London) Ltd. involved a dealer in textiles that occupies areas in the ground and basement floors of London’s Cavendish Hotel and which wishes to renew its tenancy relying on the security given by the Landlord and Tenant Act 1954, which gives such tenants the right to renew their tenancies except in certain circumstances.
One of the circumstances in which a renewal can be refused is if the landlord wishes to demolish or reconstruct the premises occupied by the tenant. The landlord (which runs the hotel) claimed that it did and it could not carry out the works it wishes to undertake without gaining possession of the tenanted premises.
What made this somewhat different from the norm was that it appeared that the landlord would not have wanted to carry out the work it used to justify the termination of the tenancy if the tenant had agreed willingly to vacate the building. The tenant claimed that the landlord’s motivation was purely to evict it and therefore the landlord should not be allowed to terminate the lease.
The High Court’s judgment was that there was one core issue: did the landlord really intend to carry out the work? That alone would decide the matter. The landlord’s motivation for doing the work was not in point.
The case isn’t quite over. The County Court has to decide on the extent to which the work specified might be able to be done leaving the tenant in place and also the timescale in which the work should be commenced.
However, it is quite feasible that landlords seeking to remove protected commercial tenants may, if the premises offer a financially suitable redevelopment opportunity, use the works primarily as a device to remove an unwanted tenant.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.