Minor works
The phrase ‘minor works’ refers to small, relatively straight-forward construction projects, typically less than £500,000 in value.
In particular the phrase is used in relation to the Joint Contracts Tribunal (JCT) Minor Works Building Contract. This contract follows the traditional procurement route, where first the design is completed, and then a contractor is appointed to construct the works. JCT do not set a limit for the minor works building contract in terms of value, but typically it will be used on projects of less than £250,000.
More important than value in determining whether this is an appropriate form of contract is the nature of the project.
It can be used for projects where:
- The project is fairly simple.
- The project should last no more than 12 months.
- The client is responsible for procuring the design, including drawings, a specification, or work schedules.
- Or the contractor is responsible for designing specific parts of the works (Minor Works Building Contract with contractor’s design).
It is not suitable where:
- The project is more complex.
- The project design includes bills of quantities.
- The project has detailed control procedures.
- The project has multiple phases or sections.
- There are provisions to govern work carried out by named specialists.
The JCT Minor Works Building Contract is more straight forward to administer than many other forms of contract, however, the parties will still need to be very clear of their obligations and liabilities and the risks that they are accepting. Generally the client’s architect or contract administrator will administer the contract.
Other standard forms of minor works contract are available. The New Engineering Contract (NEC) states that its contracts can be used for minor works, and the Federation of Master Builders publishes a freely available suite of minor works contracts.
The Institution of Civil Engineers (ICE) and the Government Conditions of contract (GC Works) contracts have now been withdrawn in favour of NEC contracts.
NB Safety at Street Works and Road Works, A Code of Practice, published by Department for Transport in October 2013, defines minor works as: ‘works with a planned duration of three days of less, excluding immediate or major works.’
[edit] Related articles on Designing Buildings
- Causes of construction disputes.
- Construction contracts.
- Contract claims.
- JCT.
- JCT Design and Build Contract.
- JCT Sub-subcontract.
- Modifying clauses in standard forms of construction contract.
- NEC contract.
- Procurement route.
- Repair and maintenance contract.
- RIBA Concise Building Contract.
- RIBA Domestic Building Contract.
- Standard Building Contract.
- Traditional contract.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.