Material amendment to planning permission
It is sometimes necessary to change development proposals after planning permission has been granted.
There are three ways that this can be dealt with:
- Where they are not significant changes, they may be described as ‘non-material amendments’. Section 96A of the Town and Country Planning Act 1990 permits applications for non-material amendment to existing planning permissions which remain subject to the original conditions and time limits.
- Where changes are more significant, they may be described as 'minor material amendments'. Section 73 of the Town and Country Planning Act 1990, allows an application to be made to permit conditions associated with the original permission to be varied or removed. This can be used to vary a condition that lists the drawings associated with the existing planning permission. If there is no such condition, one may be added using an application under section 96A of the Town and Country Planning Act 1990 and then a section 73 application to vary that condition.
- Where an amendment is considered to be a ‘material amendment’ a complete new planning application is required.
There is no statutory definition of what ‘minor material amendment’, ‘non-material amendment’ or ‘material amendment’ mean, instead, local authorities are responsible for deciding, given the local context in each case.
Guidance simply states that, ‘in deciding whether a change is material, a local planning authority must have regard to the effect of the change, together with any previous changes made’, and that, ‘minor material amendments are likely to include any amendment where its scale and/or nature results in a development which is not substantially different from the one which has been approved.’
Material amendments, for which a fresh application might be required could include:
- Significantly increasing its size.
- Changes to windows or other openings that impact on neighbouring properties.
- Changes that alter the description of development.
- Changes to the application site area.
- Significant alterations to the design or the siting of the proposals.
- Changes that would affect objections to the original proposal.
A new application is always required for changes to listed building consents and conservation area consents.
If an application for a non-material or minor material amendment is rejected, a new permission must then be sought, and this can result in significant delays. It is advisable therefore that pre-application discussions should be held before any application to amend a permission is submitted.
[edit] Related articles on Designing Buildings
- Detailed planning application.
- Material alteration.
- Material change of use.
- Minor material amendment.
- National Planning Policy Framework.
- National Planning Practice Guidance.
- Non material amendment.
- Outline planning application.
- Permitted development.
- Planning authority.
- Planning conditions.
- Planning consultant.
- Planning enforcement.
- Planning obligations.
- Pre-application advice.
- Section 106 agreement.
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
























