Interface risk in construction
Interfaces are points of interaction between two or more aspects of a project:
- Physical interfaces occur where different contractors are engaged on the same project, particularly where their respective works interact or connect in some way.
- Relationship interfaces occur between different stakeholders on a project, such as; contractors, local community groups, regulatory bodies, the client, and so on.
Interface risk, and the failure to manage it effectively, is a common cause for problems on construction projects, giving rise to:
- Delays in completion.
- Claims for damages.
- Stakeholder complaints.
- Loss of profit.
- Industrial action.
- Regulatory infringements.
- Reputational damage.
Managing interface risks between the contracting parties typically involves contractual provisions which might include collaboration and co-operation clauses, clear and complete design documents and specifications, fit for purpose clauses, insurances and warranties, variation clauses and so on.
Interfaces between parties without a contractual relationship can be less straight-forward, but may involve:
- Alliancing and partnering agreements to encourage stakeholders to tackle interfaces early on, and promote a no-blame culture.
- Regular meetings between stakeholders to identify and manage new interfaces.
- Stakeholder mapping and stakeholder management strategies to predict how the project will affect stakeholders and how they can affect the project.
- Identifying and assessing third party dependencies.
It is important that responsibility for managing interfaces is allocated to a specific individual or organisation, as they can often fall between responsibilities or contracts. This is particularly important on large or complex projects where there may be a very large number of interfacing organisations, contracts and packages of work.
New technologies such as Building Information Modelling (BIM) can help identify both soft and hard interface risks, as well as encouraging effective collaboration between stakeholders on a project. Clash avoidance and clash detection should be carried out as an integral part of the design and construction process, from defining standard methods and procedures and establishing a BIM volume strategy, through to specialist design and the creation of a virtual construction model and should continue during the construction phase itself as models are updated with as-constructed information.
[edit] Related articles on Designing Buildings Wiki
- A solution to handle large and complex construction projects: Interface Management.
- Code of practice for project management.
- Conflict of interest.
- Design management.
- Method statement.
- Programme.
- Project manager.
- Receptor.
- Risk assessment.
- Risk in building design and construction.
- Risk management.
- Stakeholders.
Featured articles and news
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.