Full Repairing and Insuring Lease FRI
A Full Repairing and Insuring Lease (FRI lease) is usually a commercial lease where the landlord has no repair or insurance liability and as such it lies on the leaseholder. An FRI ma also be referred to as a repairing covenant or as a repairing duty, which transfers the legal obligation for repair of part or all of a building to the tenant. In comparison to this an Internal Repairing Insuring lease (or IRI lease) is where the tenant has a narrower liability for maintenance, decorations, repairs and insurance which is confined to the internal parts of the property that they occupy.
[edit] Related articles on Designing Buildings
- Alienation covenant.
- Covenant.
- Covenant against contingent liabilities.
- Deed of easement.
- Derogation from grant.
- Easements.
- Encumbrances.
- Leasehold covenants.
- Liens.
- Modifying a restrictive covenant.
- PAS 2035.
- PAS 2038:2021 Retrofitting non-domestic buildings for improved energy efficiency.
- Premises.
- Refurbishment.
- Renovation.
- Renovation v refurbishment v retrofit.
- Retrofit and traditional approaches to comfort.
- Retrofit coordinator.
- Repairing covenants.
- Restrictive covenant.
- Right to light.
- Right to a view.
- Rights of way.
- Servient estate.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.






















