Finished floor level
|
Contents |
[edit] What is the finished floor level?
Finished floor level (FFL) refers to the uppermost surface of a floor once construction has been completed but before any finishes have been applied. So, in concrete construction it may be the uppermost surface of a screeded finish, or in timber construction, FFL will denote the top level of floorboards, chipboard or ply decking.
Finished floor level does not take into account any applied finishes as these may be added by owners, occupiers or tenants, will vary in thickness, e.g a thick shag-pile carpet has different thickness to a laminated floor, and may be replaced.
[edit] How is finished floor level expressed?
Floor levels and other vertical dimensions are usually expressed in metres to three decimal places, e.g FFL 16,550. On construction drawings (plans, sections and elevations), finished floor level may be abbreviated ‘FFL 27,000’, the figure suffixed denoting the level in metres above a defined datum level (usually outside ground level or ground floor level). The floor above may be FFL 31,000 and the floor below FFL 23,000.
On some large projects, the job datum may be related to the Ordnance datum - the height of mean sea-level, taken from a reference point at Newlyn in Cornwall. Where there is the possibility of a minus datum figure, the minus sign may be misread or cause confusion if included in FFL data. In these circumstances, a temporary bench mark (TBM) may be introduced to ensure all other levels are positive.
To differentiate between existing and intended (to be constructed) levels, the latter will usually have a rectangle around the numbers. In addition, the numbers may be beside or above an arrow that indicates the finished floor level. On a plan, the exact position where the figure applies is usually indicated by an ‘x’.
[edit] What are the benefits of measuring finished floor levels?
As each floor will have a different level, the FFL figures will have been produced by a measured survey and serve to confirm that:
- The floor levels are correct and have been constructed according to plan.
- Subtracting one floor level from say, the one above can give the FFL-to-FFL storey height.
- They give an indication of the levels relative to ground level, adjacent buildings or other buildings on the site. This is particularly useful when physical links, ramps or walkways must be constructed between buildings.
- FFL figures can be transposed onto elevations to indicate relative floor levels and their relation to the facade.
[edit] Related articles on Designing Buildings
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.























Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.
"So you could potentially end up with a variety of screed levels across the same floor due to varying finish build up? i.e. marble/ carpet/ timber etc. Where's common sense when you need it."
In response to above ^
It is very rare that finishes are known when you begin to design a building (hence this being the sensible working definition for FFL).
Adjustments for things like an unusually thick wearing finish would typically see the screed in the localised area adjusted. This adjustment would then be denoted on applicable plans/section as a +/- from the building FFL for that level.
The minimal difference between carpet/tile etc. is lost in threshold strips.
Hope that makes sense.