Drawdown
Contents |
[edit] Introduction
In relation to property development finance, the term 'drawdown' can have numerous meanings, including a portion of the funding - or drawdown - received incrementally over the duration of the project. Under this definition, a drawdown on financing (such as a loan) may be taken in stages to finance a project. The incremental distribution of funds is sometimes referred to as a progressive drawdown.
In some instances, drawdown may refer to the initiation of a transaction - or drawdown - under a loan agreement. Under this definition, funds can become available (or are officially borrowed) on a drawdown date. It can also be an amount of money - or drawdown - borrowed for a specific purpose. This usage is considered informal and is not traditionally used in the context of property development financing.
When not associated with financial matters, drawdown may refer to the controlled reduction of fluids or pressure wells, reservoirs and so on.
[edit] Drawdown and cash flow
The incremental distribution of funds is sometimes referred to as a progressive drawdown. While a progressive drawdown provides resources as needed, the success of this approach may require careful planning to ensure cash is distributed at the appropriate stages based on the progress of the project.
If drawdown is dictated by a schedule provided by the funder, this may present issues during times when increased spending is necessary, but money is not available. There may also be periods when less money is required, and an unsuitable drawdown schedule will result in the unnecessary release of funding.
With a progressive drawdown, it is possible to lower interest payments when compared to situations where the entire amount is borrowed at the start of the project. However, if too much of a progressive drawdown is taken too quickly, this can result in the accrual of additional interest.
The agreed interest rate and drawdown facilities should be provided in the funding or loan contract. Interest rates might be fixed, variable and/or capped. Drawdown facilities (often on a quarterly basis) need to be more than sufficient and timed to meet monthly valuations. Often developers will base residual value calculations on drawing down all construction and professional payments by the two thirds stage of the project to avoid any risk of defaulting on payments.
Careful planning cannot always anticipate emergency situations that may have an impact on the progress of a project and the allocation of resources. In these instances, drawdown contingency management measures should be considered. One consideration may be the creation of a contingency drawdown curve which can be updated regularly for revised forecasting.
[edit] Drawdown requirements
There is some general information that is typically part of financing arrangements that have drawdown agreements. This may include a specific time period for transactions (depending on agreed upon conditions) referred to as a conditions precedent.
A conditions precedent is used to safeguard funds. It requires that certain events take place in order for the contract to be valid. It may also require the submission of certain documentation, including:
- Official documents (such as project agreements) for borrowers and those providing security.
- Proof of authorisations (documents power and capacity) for borrowers and those providing security.
- Licences and consents evidence.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.