Design Framework for Building Services 5th Edition (BG 6/2018)
On 14 June 2018, BSRIA launched the latest edition of its popular Design Framework guide BG6, written by David Churcher Martin Ronceray and John Sands.
BG6/2018 Design Framework for Building Services 5th Edition is an industry standard document for building services consultants and contractors, helping them and their clients define the extent of their design activities and deliverables. It contains design activity proformas, and drawing and model definitions that can be used to support contract documentation and encourage collaborative working between building services and other designers.
There is a myriad of activities required to produce the necessary level of detail and information to procure a new building. BG 6 provides a platform for these activities to be identified and allocated to organisations or individuals within the project team.
Key changes from the 4th edition include:
- A new layout with clear colour coding for easier navigation.
- Better guidance for the user.
- Completely revised stage-by-stage tasks descriptions as pro-formas.
- New and more illustrations of 3D models and drawings delivered at different project stages.
- More comprehensive listings of deliverables, available as an online resource.
- A range of worked examples showing how the tools can be used for different types of project or appointment, both in the appendix and online.
David Bleicher, Publications Manager at BSRIA, said: “In recent years – changes in technology have brought with them new issues concerning the level of information provided as outputs from design activities. They have also highlighted the need for clarity around existing topics such as the resolution of clashes throughout the design stages and defining coordination roles and responsibilities... The release of this new edition ensures that BG 6 continues to be the industry standard document for building services consultants, consulting engineers, contractors and designers. It helps them, and their clients, clarify and define the extent and timing of their design activity and design deliverables on any specific project.”
Its contents are:
- Glossary.
- Introduction.
- About BG6.
- How to use BG6.
- Appendix A: Allocating design activity.
- Appendix B: Allocating model, drawing and information production.
- Appendix C: Examples of using BG6.
- References.
- Bibliography.
It is available in hard copy, pdf and multi-site licensed versions. The licensed version contains:
- An unlocked PDF.
- An editable Word version.
- An Excel workbook of all the pro-formas.
- An unlocked pdf of the 4th edition.
- An Excel workbook of all the pro-formas from the fourth edition.
- Free updates for one year from the purchase date.
--BSRIA
[edit] Related articles on Designing Buildings
Featured articles and news
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.