Design Framework for Building Services 5th Edition (BG 6/2018)
On 14 June 2018, BSRIA launched the latest edition of its popular Design Framework guide BG6, written by David Churcher Martin Ronceray and John Sands.
BG6/2018 Design Framework for Building Services 5th Edition is an industry standard document for building services consultants and contractors, helping them and their clients define the extent of their design activities and deliverables. It contains design activity proformas, and drawing and model definitions that can be used to support contract documentation and encourage collaborative working between building services and other designers.
There is a myriad of activities required to produce the necessary level of detail and information to procure a new building. BG 6 provides a platform for these activities to be identified and allocated to organisations or individuals within the project team.
Key changes from the 4th edition include:
- A new layout with clear colour coding for easier navigation.
- Better guidance for the user.
- Completely revised stage-by-stage tasks descriptions as pro-formas.
- New and more illustrations of 3D models and drawings delivered at different project stages.
- More comprehensive listings of deliverables, available as an online resource.
- A range of worked examples showing how the tools can be used for different types of project or appointment, both in the appendix and online.
David Bleicher, Publications Manager at BSRIA, said: “In recent years – changes in technology have brought with them new issues concerning the level of information provided as outputs from design activities. They have also highlighted the need for clarity around existing topics such as the resolution of clashes throughout the design stages and defining coordination roles and responsibilities... The release of this new edition ensures that BG 6 continues to be the industry standard document for building services consultants, consulting engineers, contractors and designers. It helps them, and their clients, clarify and define the extent and timing of their design activity and design deliverables on any specific project.”
Its contents are:
- Glossary.
- Introduction.
- About BG6.
- How to use BG6.
- Appendix A: Allocating design activity.
- Appendix B: Allocating model, drawing and information production.
- Appendix C: Examples of using BG6.
- References.
- Bibliography.
It is available in hard copy, pdf and multi-site licensed versions. The licensed version contains:
- An unlocked PDF.
- An editable Word version.
- An Excel workbook of all the pro-formas.
- An unlocked pdf of the 4th edition.
- An Excel workbook of all the pro-formas from the fourth edition.
- Free updates for one year from the purchase date.
--BSRIA
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Construction Management, 8 July
NEETs crisis drives interest in trades, but apprenticeships barriers remain.
Passive fire protection webinar
MEP services penetration seals.
Where its at podcast (and video) - The role of the Architectural Technologist as an Expert Witness.
More than 200 remarkable buildings added to SAVE’s Buildings at Risk register.
Government scraps pre-application consultation for Nationally Significant Infrastructure Projects.
Historic England and infrastructure
New projects offer opportunities for the historic environment and local communities.
Construction Management, 2 July
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.


















