Demurrage
Demurrage refers to the charges levied on a contractor or supplier for delaying the return of rented equipment or for holding up the delivery of materials beyond the agreed time.
For example, when a contractor rents equipment (such as cranes, excavators, or other machinery), there is usually a specified rental period. If the equipment is not returned within this period, the rental company may impose demurrage charges to compensate for the extended use and any potential loss of income from not being able to rent the equipment to other clients.
Demurrage can also apply to the delivery of construction materials. If a contractor or site is not ready to receive materials at the agreed time, causing delivery trucks to wait or make additional trips, the supplier may charge demurrage fees. This compensates the supplier for the time and resources spent on the delayed delivery.
In broader logistics, demurrage charges can apply to the detention of shipping containers beyond the allocated free time. If containers are not unloaded and returned within the agreed time, demurrage fees may be incurred to cover the costs of the delayed return.
The specifics of demurrage charges, including the rate and conditions, are usually detailed in the contract agreements between the parties. These agreements outline the responsibilities and expectations regarding the rental and material delivery timelines.
[edit] Related articles on Designing Buildings
Featured articles and news
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.