Demurrage
Demurrage refers to the charges levied on a contractor or supplier for delaying the return of rented equipment or for holding up the delivery of materials beyond the agreed time.
For example, when a contractor rents equipment (such as cranes, excavators, or other machinery), there is usually a specified rental period. If the equipment is not returned within this period, the rental company may impose demurrage charges to compensate for the extended use and any potential loss of income from not being able to rent the equipment to other clients.
Demurrage can also apply to the delivery of construction materials. If a contractor or site is not ready to receive materials at the agreed time, causing delivery trucks to wait or make additional trips, the supplier may charge demurrage fees. This compensates the supplier for the time and resources spent on the delayed delivery.
In broader logistics, demurrage charges can apply to the detention of shipping containers beyond the allocated free time. If containers are not unloaded and returned within the agreed time, demurrage fees may be incurred to cover the costs of the delayed return.
The specifics of demurrage charges, including the rate and conditions, are usually detailed in the contract agreements between the parties. These agreements outline the responsibilities and expectations regarding the rental and material delivery timelines.
[edit] Related articles on Designing Buildings
Featured articles and news
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherit assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.