Consequential improvements in construction
Consequential improvements refer to energy efficiency improvements that are consequential to changes to a building, which are required by regulation 28 of the Building Regulations (guidance for which appears in Section 6 of Approved document L2B: Conservation of fuel and power in existing buildings other than dwellings) to make the whole building comply with Part L of the Building Regulations
The regulation relates to proposed works to existing buildings (other than dwellings) with a total useful floor area of over 1000m2, and include:
- An extension.
- Installation of new fixed building services (other than renewable energy generators).
- Increasing the capacity of fixed building services (other than renewable energy generators).
Where such works are proposed, additional consequential improvements will be required to the extent that the necessary improvements are technically, functionally and economically feasible.
In most circumstances, this means that the payback period for the consequential improvements required does not exceed 15 years (or less if the expected life of the building is less than 15 years).
Consequential improvements could include:
- Upgrading heating, cooling or air handling systems.
- Upgrading lighting systems.
- Installing energy metering.
- Upgrading thermal elements.
- Replacing windows.
- On-site energy generation.
- Applying measures proposed in a recommendations report accompanying an Energy Performance Certificate.
In the case of an extension, the regulation can be complied with if the value of consequential improvements is not less than 10% of the value of the principal works.
In the case of changes to fixed building services, the building fabric should be improved so that the energy consumption of the services is not excessive, and additional consequential improvements must be made as described in the list above. Improvements to the building fabric in this case do not count towards the value of the consequential improvements. NB This does not apply if the services capacity is increased to supply a new extension rather than to improve services to an exiting space.
For changes to fixed building services, improvements to the building fabric are considered technically, functionally and economically feasible where the existing thermal elements have a U-value lower than those set out in the approved document. In the case of cooling, both the U-values of thermal elements and the solar gains of windows are set out, and in the case of lighting, an effective lamp efficacy is set.
Once the works are complete, the building owner should be provided with sufficient information to operate the building efficiently. This can be done by preparing a building log book.
NB Proposals to extend requirements for consequential improvements to dwellings (as part of the introduction of the green deal) were finally dropped by Communities Secretary Eric Pickles at the end of 2012.
[edit] Related articles on Designing Buildings
- Building log book.
- Building Regulations.
- Energy efficiency of traditional buildings.
- Energy performance certificates.
- Energy targets.
- Environmental plan.
- Green Deal.
- Principal works.
- Sustainability.
- U-Value.
[edit] External references
- Approved document L2B: Conservation of fuel and power in existing buildings other than dwellings.
Featured articles and news
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.