Caveat
In the context of the UK construction industry, a caveat is a formal warning or caution expressed within a contract, agreement, or legal document. It serves to alert parties to specific conditions, limitations, or potential issues that might affect the terms and execution of a project. It is essentially a cautionary note, informing one or more parties of certain conditions or potential problems that should be acknowledged and addressed.
Caveats protect the interests of parties by ensuring that certain risks and liabilities are acknowledged and addressed upfront. By clearly outlining specific conditions and limitations, caveats help to clarify the responsibilities and expectations of the parties involved in a construction project. Properly drafted caveats can reduce the likelihood of disputes by making parties aware of potential issues and the agreed-upon handling of those issues.
In construction contracts, caveats can be used to highlight specific risks, exclusions, or conditions that may impact the obligations and liabilities of the parties involved. Including a caveat in a contract can have significant legal implications, as it formally notifies the parties of certain issues, which can affect the enforceability of certain claims or defenses.
Caveats can be used to allocate risks clearly between parties. For example, a caveat might state that the contractor is not responsible for delays caused by unforeseen ground conditions.
A contract might include caveats that exclude certain liabilities or limit the scope of work. For instance, a caveat might specify that the contractor is not liable for defects arising from materials supplied by the client. Caveats can also specify conditions that must be met before certain obligations come into effect. For example, a caveat might state that the start of construction is contingent upon obtaining all necessary permits and approvals.
A caveat might require one party to notify the other of specific issues within a certain timeframe. For example, a contractor might be required to notify the client of any discrepancies in the project drawings within seven days of discovering them.
Examples of caveats in construction contracts might include
- "The contractor shall not be liable for delays caused by unforeseen ground conditions, provided that the contractor notifies the client within 48 hours of discovering such conditions."
- "Commencement of the works is subject to obtaining all necessary planning permissions and regulatory approvals. The client shall bear the responsibility for any delays resulting from the failure to obtain such approvals."
- "The contractor is not responsible for any defects arising from materials specified by the client, provided that the contractor installs such materials in accordance with the manufacturer's instructions."
Caveats serve as crucial tools for managing risks, clarifying contractual terms, and setting expectations between parties. Properly understanding and utilising caveats can help prevent misunderstandings and legal disputes, ensuring a more efficient and collaborative project environment.
See also: Caveat emptor (or ‘buyer beware’).
[edit] Related articles on Designing Buildings
Featured articles and news
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.