Caveat
In the context of the UK construction industry, a caveat is a formal warning or caution expressed within a contract, agreement, or legal document. It serves to alert parties to specific conditions, limitations, or potential issues that might affect the terms and execution of a project. It is essentially a cautionary note, informing one or more parties of certain conditions or potential problems that should be acknowledged and addressed.
Caveats protect the interests of parties by ensuring that certain risks and liabilities are acknowledged and addressed upfront. By clearly outlining specific conditions and limitations, caveats help to clarify the responsibilities and expectations of the parties involved in a construction project. Properly drafted caveats can reduce the likelihood of disputes by making parties aware of potential issues and the agreed-upon handling of those issues.
In construction contracts, caveats can be used to highlight specific risks, exclusions, or conditions that may impact the obligations and liabilities of the parties involved. Including a caveat in a contract can have significant legal implications, as it formally notifies the parties of certain issues, which can affect the enforceability of certain claims or defenses.
Caveats can be used to allocate risks clearly between parties. For example, a caveat might state that the contractor is not responsible for delays caused by unforeseen ground conditions.
A contract might include caveats that exclude certain liabilities or limit the scope of work. For instance, a caveat might specify that the contractor is not liable for defects arising from materials supplied by the client. Caveats can also specify conditions that must be met before certain obligations come into effect. For example, a caveat might state that the start of construction is contingent upon obtaining all necessary permits and approvals.
A caveat might require one party to notify the other of specific issues within a certain timeframe. For example, a contractor might be required to notify the client of any discrepancies in the project drawings within seven days of discovering them.
Examples of caveats in construction contracts might include
- "The contractor shall not be liable for delays caused by unforeseen ground conditions, provided that the contractor notifies the client within 48 hours of discovering such conditions."
- "Commencement of the works is subject to obtaining all necessary planning permissions and regulatory approvals. The client shall bear the responsibility for any delays resulting from the failure to obtain such approvals."
- "The contractor is not responsible for any defects arising from materials specified by the client, provided that the contractor installs such materials in accordance with the manufacturer's instructions."
Caveats serve as crucial tools for managing risks, clarifying contractual terms, and setting expectations between parties. Properly understanding and utilising caveats can help prevent misunderstandings and legal disputes, ensuring a more efficient and collaborative project environment.
See also: Caveat emptor (or ‘buyer beware’).
[edit] Related articles on Designing Buildings
Featured articles and news
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.