Caveat
In the context of the UK construction industry, a caveat is a formal warning or caution expressed within a contract, agreement, or legal document. It serves to alert parties to specific conditions, limitations, or potential issues that might affect the terms and execution of a project. It is essentially a cautionary note, informing one or more parties of certain conditions or potential problems that should be acknowledged and addressed.
Caveats protect the interests of parties by ensuring that certain risks and liabilities are acknowledged and addressed upfront. By clearly outlining specific conditions and limitations, caveats help to clarify the responsibilities and expectations of the parties involved in a construction project. Properly drafted caveats can reduce the likelihood of disputes by making parties aware of potential issues and the agreed-upon handling of those issues.
In construction contracts, caveats can be used to highlight specific risks, exclusions, or conditions that may impact the obligations and liabilities of the parties involved. Including a caveat in a contract can have significant legal implications, as it formally notifies the parties of certain issues, which can affect the enforceability of certain claims or defenses.
Caveats can be used to allocate risks clearly between parties. For example, a caveat might state that the contractor is not responsible for delays caused by unforeseen ground conditions.
A contract might include caveats that exclude certain liabilities or limit the scope of work. For instance, a caveat might specify that the contractor is not liable for defects arising from materials supplied by the client. Caveats can also specify conditions that must be met before certain obligations come into effect. For example, a caveat might state that the start of construction is contingent upon obtaining all necessary permits and approvals.
A caveat might require one party to notify the other of specific issues within a certain timeframe. For example, a contractor might be required to notify the client of any discrepancies in the project drawings within seven days of discovering them.
Examples of caveats in construction contracts might include
- "The contractor shall not be liable for delays caused by unforeseen ground conditions, provided that the contractor notifies the client within 48 hours of discovering such conditions."
- "Commencement of the works is subject to obtaining all necessary planning permissions and regulatory approvals. The client shall bear the responsibility for any delays resulting from the failure to obtain such approvals."
- "The contractor is not responsible for any defects arising from materials specified by the client, provided that the contractor installs such materials in accordance with the manufacturer's instructions."
Caveats serve as crucial tools for managing risks, clarifying contractual terms, and setting expectations between parties. Properly understanding and utilising caveats can help prevent misunderstandings and legal disputes, ensuring a more efficient and collaborative project environment.
See also: Caveat emptor (or ‘buyer beware’).
[edit] Related articles on Designing Buildings
Featured articles and news
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.