Bill of quantities software
A bill of quantities (sometimes referred to as a 'BoQ' or 'BQ') is a document, typically prepared by a cost consultant (often a quantity surveyor) that provides measured quantities of the items of work identified by the drawings and specifications in the tender documentation for a project. It is issued to tenderers for them to prepare a price for carrying out the works.
Manual estimating can be an inefficient use of time, and so cost consultants often use BoQ software packages to make the process easier and to reduce errors. Databases may already exist providing design information from a building model, and specifications, and so quantities can be calculated and tender documents generated. During the design process, new measurements can be filed and included, with the result that every item, as well as the totals, are updated automatically.
Different levels of subdivision allow cost details for super- or sub-groupings to be created, which enables easy preparation of documents focusing on specific parts of the projects. Software can enable the organisation of BoQs into different work sections, grouping homogeneous categories of work. It may also be possible to re-order BoQ's from one breakdown structure to another. For more information see: Bill of quantities breakdown structures.
A digital version of the bill of quantities can also support the calculation and agreement of variations during the construction phase.
Typically, BoQ software uses the What You See Is What You Get (WYSIWYG) interface, allowing the user to work on screen as though they were working on a paper document. This increases the intuitive nature of the data entry. Drag and Drop actions enable users to copy data from document to document.
Many software programs also use pricing libraries, providing consistent, accurate and well-documented rate build-ups. Item description libraries can also be used to reduce the time taken for bill capture.
[edit] Related articles on Designing Buildings
- Advantages of a bill of quantities.
- Bill of quantities.
- Bill of quantities breakdown structures.
- Common Arrangement of Work Sections (CAWS).
- Common mistakes in bill of quantities.
- Computers in construction tendering.
- E-procurement.
- ESignatures.
- Excel and construction.
- Firm bill of quantities.
- Information and communications technology in construction.
- RFx.
- Taking off.
- Types of bill of quantities.
- Work package bill of quantities.
- Work section bill of quantities.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
New and updated CLC building safety guidance.
New UK National Buildings Database.
Building Safety Wiki Interviews
Chief executive of the British Woodworking Federation.
Planning condition discharge in England and Wales
A brief explanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
Shading for housing, a design guide
From the Good Homes Alliance and British Blind and Shutter Association.
UK Standard Skills Classification (SSC)
A shared framework for describing skills needs.
Social media ban consultation comes to close
CIOB urges UK Government to consider social media’s role in careers guidance in ban debate.
The latest of eight Skills England apprenticeship units
The addition of battery manufacturing welcomed by ECA with a warning about the risks of fast-tracked apprenticeship units.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.

















Comments
This should include actual examples