Asbestos survey
Asbestos Legal Requirements And Best Practice For Property Professionals And Clients, 4th Edition, published by the Royal Institution of Chartered Surveyors (RICS) in May 2021, defines an asbestos survey as: ‘The process of surveying a property for asbestos containing materials. Different levels of asbestos survey are available’
It describes a management survey as: 'A type of asbestos survey undertaken to ensure asbestos containing materials that may be disturbed during the normal day-to-day management of a property have been identified.'
See also: Asbestos management.
[edit] Related articles on Designing Buildings
- Asbestos.
- Asbestos cement.
- Asbestos coating.
- Asbestos insulation.
- Asbestos management.
- Asbestos register.
- Asbestos surveyor.
- Control of Asbestos Regulations 2012 CAR12.
- Deleterious materials.
- Failure to mention asbestos.
- Five signs you are at risk of asbestos poisoning at work.
- Licensable work with asbestos.
- Survey.
- The risk of asbestos on brownfield sites.
Featured articles and news
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.



















Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.