User contributions
(Latest | Earliest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)
- 08:51, 7 November 2011 (diff | hist) N OJEU procurement procedures (Created page with "The European Union Procurement Directives establish public procurement rules throughout the European Union and apply to any public purchases above the defined thresholds. The pur...")
- 08:31, 7 November 2011 (diff | hist) N Options review report (Created page with "As with the feasibility studies, the options review report does not involve 'design' in the traditional sense. Its purpose is to enable the client to understand the broad pros an...")
- 08:28, 7 November 2011 (diff | hist) Planning appeal
- 07:51, 5 November 2011 (diff | hist) N Outline planning application (Created page with "Before making a planning application it is important to check with the local planning authority; when planning meetings are held and the what the procedures are. Outline plannin...")
- 07:43, 5 November 2011 (diff | hist) Specification for construction
- 07:42, 5 November 2011 (diff | hist) N Outline specification (Created page with "Specifications are written documents that describe the materials and workmanship required for a development. They do not include cost, quantity or drawn information but need to b...")
- 07:40, 5 November 2011 (diff | hist) N Output-based specification (Created page with "Output-based specifications are used on publicly-funded projects following the OGC gateway procedure to define the client's functional requirements for their new development. It ...")
- 07:32, 5 November 2011 (diff | hist) N Production information report for design and construction (Created page with "The production information report is a work stage report produced by the consultant team for the client at the end of the production information stage (see work plans on home pag...")
- 07:29, 5 November 2011 (diff | hist) N Production information (Created page with "NB for detailed descriptions of the tasks involved in preparing production information see the free work plans available from the designing buildings wiki home page. The [http:/...")
- 07:23, 5 November 2011 (diff | hist) N Procurement route (Created page with "There are many different routes by which the design and construction of a building can be procured. The most appropriate procurement route for a project is the one that offers th...")
- 07:09, 5 November 2011 (diff | hist) N Pre-tender interview (Created page with "Following assessment of pre-qualification questionnaires submitted by prospective tenderers, and initial short-list of prospective tenders may be invited to attend pre-tender int...")
- 07:06, 5 November 2011 (diff | hist) N Pre-tender estimate for contracts (Created page with "Key cost planning information prepared by the cost consultant include: *Initial cost appraisals of options (feasibility studies). *Elemental cost plan (from project brief throug...")
- 07:03, 5 November 2011 (diff | hist) N Pre-qualification questionnaire PQQ for construction contracts (Created page with "A pre-qualification questionnaire (PQQ) sets out a series of questions about potential tenderers level of experience, capacity and financial standing. The answers to these questi...")
- 08:49, 4 November 2011 (diff | hist) Design and build: concept design (design by contractor)
- 08:48, 4 November 2011 (diff | hist) Design and build: project brief
- 08:46, 4 November 2011 (diff | hist) Design and build: project brief
- 08:45, 4 November 2011 (diff | hist) Design and build: feasibility studies
- 08:43, 4 November 2011 (diff | hist) Public project: construction
- 08:42, 4 November 2011 (diff | hist) Public project: concept design
- 08:41, 4 November 2011 (diff | hist) Public project: concept design
(Latest | Earliest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)
Featured articles and news
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.