Specified perils in construction contracts
Construction works involve large amounts of money and are at high risk of damage. As a consequence construction contracts will generally include an obligation to insure:
- The works.
- On-site materials or goods.
- Off-site materials or goods.
- Existing structures and their contents.
This insurance may cover all risks, or may be restricted to certain ‘specified perils.’
Specified perils tend to be significant events that would cause very significant damage, such as fire, explosions, earthquakes, flooding and so on. All-risks insurance will tend to cover a broader range of risks, albeit it may not cover every possible risk.
Policies may be taken out by the contractor or by the client depending on the form of contract and the options selected, and may be for all risks, specified perils, or a combination for different parts of the cover. For example existing structures might be insured against specified perils whilst the construction works might be insured against all risks.
Insurance will generally be in the form of a ‘joint names policy’ in the names of the contractor and the client. This gives both parties their own rights to claim against the insurer. Other parties, such as funders may also be added as a joint name.
Joint-names insurance will generally prevent claims against the co-insured party for an insured loss. Whether or not claims can be made by one party against the other for uninsured losses where one of the parties is at fault will depend on whether the contract permits this or not.
NB See also relevant events.
[edit] Related articles on Designing Buildings
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.