Specified perils in construction contracts
Construction works involve large amounts of money and are at high risk of damage. As a consequence construction contracts will generally include an obligation to insure:
- The works.
- On-site materials or goods.
- Off-site materials or goods.
- Existing structures and their contents.
This insurance may cover all risks, or may be restricted to certain ‘specified perils.’
Specified perils tend to be significant events that would cause very significant damage, such as fire, explosions, earthquakes, flooding and so on. All-risks insurance will tend to cover a broader range of risks, albeit it may not cover every possible risk.
Policies may be taken out by the contractor or by the client depending on the form of contract and the options selected, and may be for all risks, specified perils, or a combination for different parts of the cover. For example existing structures might be insured against specified perils whilst the construction works might be insured against all risks.
Insurance will generally be in the form of a ‘joint names policy’ in the names of the contractor and the client. This gives both parties their own rights to claim against the insurer. Other parties, such as funders may also be added as a joint name.
Joint-names insurance will generally prevent claims against the co-insured party for an insured loss. Whether or not claims can be made by one party against the other for uninsured losses where one of the parties is at fault will depend on whether the contract permits this or not.
NB See also relevant events.
[edit] Related articles on Designing Buildings
Featured articles and news
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.



















Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.