Radon: Guidance on protective measures for new buildings BR 211
BRE (Building Research Establishment) is an independent, research-based consultancy, testing and training organisation, operating in the built environment and associated industries.
On 6 November 2015, BRE published Radon: Guidance on protective measures for new buildings (BR 211- 2015 edition), written by Chris Scivyer.
Approved document C, Site preparation and resistance to contaminants and moisture, describes radon as:
…a naturally occurring radioactive colourless and odourless gas which is formed in small quantities by radioactive decay wherever uranium and radium are found. It can move through the subsoil and so into buildings. Some parts of the country, notably the West Country, have higher levels than elsewhere. Exposure to high levels for long periods increases the risk of developing lung cancer. To reduce this risk all new buildings, extensions and conversions, whether residential or non-domestic, built in areas where there may be elevated radon emissions, may need to incorporate precautions against radon. |
BR 211 provides guidance for reducing the concentration of radon in new buildings, extensions, conversions, and refurbishment projects, and so reducing the risk of occupants being exposed to it. It is intended for use in England, Wales, Scotland and Northern Ireland, and supports building regulations for England, Wales and Northern Ireland, and building standards for Scotland.
It was originally published in 1991 and was subsequently amended in 1992, 1999 and 2007. The 2015 edition replaces previous editions and two earlier guidance documents:
- BRE Report BR 376, Radon: guidance on protective measures for new dwellings in Scotland, introduced in 1999.
- BRE Report BR 413, Radon: guidance on protective measures for new dwellings in Northern Ireland, introduced in 2001.
Its contents are:
- Introduction.
- National building regulation guidance.
- Protective measures.
- Determining the level of protection.
- Protective measures: technical approach.
- Detailed protective measures.
- References and further reading.
- Appendix A: Maps of areas where basic or full protection should be provided.
- Appendix B: Radon protective measures quality management checklist.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Approved Document C.
- BRE articles on Designing Buildings Wiki.
- BRE Buzz articles on Designing Buildings Wiki.
- Brownfield land.
- Building on fill.
- Building Research Establishment BRE.
- Contaminated land.
- Cover systems for land regeneration - thickness of cover systems for contaminated land (BR465).
- Deleterious materials.
- Ground conditions.
- Landfill tax.
- Methane and other gasses from the ground.
- Pollution.
- Radon.
- Radon protection for new domestic extensions and conservatories with solid concrete ground floors (GG 73 revised).
- Radon protection for new dwellings GG 74.
- Radon protection for new large buildings GG 75.
- Radon solutions in older homes GR 38.
- Site appraisal.
- Site investigation.
- Soil survey.
- Solid and liquid contaminants risk assessments.
Featured articles and news
Regulator of Social Housing publishes latest fire safety report
Covering remediation of 11 metre plus social housing sector buildings.
Apartment and Duplex Defects Remediation Bill 2024
Approved for priority drafting by Government of Ireland.
The long list with in the frame of key historical events.
Competence frameworks for sustainability in the built environment
Code of practice, core criteria consultation draft for comment.
UK Net Zero Carbon Buildings Standard Sept update
Pilot version for testing and feedback on its adoption due.
New Floods Resilience Taskforce
With a wet met office autumn prediction.
National Retrofit Hub takeover of Net Zero stage
At Birmingham UK Construction Week in October.
AT Awards 2024 finalists announced
With more to come, prior to the Awards ceremony in October.
London construction cools as hotspots appear nationally
Increases in the East of England, Yorkshire and Scotland.
ARB proposals for a new Architects Code
Announced in the shadow of the final Grenfell Inquiry report.
Combining human creativity and tech innovation now and in the future
Building automation and control systems market study
BSRIA 2024 North America BACS software & services.
Impact of digital technology on productivity in construction
New CIOB academy guidance for companies of all sizes.
Demolition and retrofit approaches in Planning Policy
MHCLG demolition and retrofit survey to inform future updates to national planning policy.
Expert taskforce to spearhead new, new town generation
Sir Michael Lyons given 12 months for recommendations.
Government policy statement on new towns
A coded vision for a new generation of new towns.