[edit] Introduction
What is the best way for a space to be planned and furnished? There are two options:
- Using an independent Furniture Fittings & Equipment (FF&E) consultant to help plan the space, procure the selected furniture and fit out the space in the most suitable way.
- Appoint a furniture manufacturer or supplier
The choice should be made based on the individual specifications of the space itself, but it is important to be aware of the benefits and pitfalls for each option. To help make an informed decision, this article explains the differences between the two approaches.
[edit] Using a furniture supplier or manufacturer
Although on the surface, it may seem that going directly to a specific furniture supplier or manufacturer will make for an easier process, there are some hindrances that are naturally brought into the process with this decision:
[edit] Vested interest and lack of choice
It is often the case that furniture suppliers or manufacturers have a vested interest in supplying and installing their own products or products of companies from whom they receive commission payments, even if these are not particularly suitable to the given space, making them more difficult to integrate with the space and the architect’s and/or designer’s vision.
[edit] Hidden costs
In this scenario, consultancy fees are often artificially low, as they are subsidised by higher profits made from supplying particular products and often don’t represent the true cost of adequately resourcing the project. What’s more, the single source manufacturers have been known to add 20-40% mark up costs on assets supplied, which can bring the costs of each project up significantly.
[edit] Business risk
Furniture and equipment orders placed with a limited number of suppliers means there is a higher risk of delays if those companies suffer production and ordering delays and there is no backup plan for any individual company going out of business during the course of the project.
[edit] Judging value and input
Because of the reasons mentioned above, it is often difficult to judge the value and/or input of the various companies involved.
[edit] Lack of transparency
Due to the commission-based model that furniture suppliers and manufacturers work on, asking such a company to control the process of design means it becomes virtually impossible to manage a fair, transparent and impartial tender process, where decisions are made based on what is best for the project, rather than any ties to specific product ranges.
[edit] Using an independent FF&E consultant
Independent FF&E consultants have no commercial links to individual manufacturers or ranges and so are able to offer an impartial consultancy service, comprising design, specification, project management, cost management, product knowledge, procurement and site supervision.
The advantages of using an independent FF&E consultant include:
[edit] Meeting client visions and ensuring best value
As the FF&E consultant is not tied to a specific supplier, they are able to draw on their knowledge of the sector and the individual client’s project specifications, whether the space in question is a classroom or a specific commercial space, in order to provide furniture and equipment that best suits the space and the way it will be used and thus meet and exceed the client vision.
[edit] Compliance and conformance to British Standards
Being able to draw on a larger pool of suppliers means not only that there is always a larger choice (and back up solution) of equipment used, but also that an FF&E consultant is able to meet any compliance standards required on the project (this is particularly important on educational spaces, for example) without issue.
[edit] Product selection and procurement strategy
Wherever possible, an FF&E consultant is able to procure the furniture and equipment to be used directly from a manufacturer, rather than involving a dealer or supplier because of their specific knowledge of the sector and current trends and solutions. Therefore, the usual 20-30% dealer margin, which adds cost but not necessarily value, can be eliminated.
[edit] Conclusion
The final decisions should always be made based on the specifics of an individual project. However, using an independent FF&E consultant may give greater flexibility in the solutions used, allowing them to suit the particular space and its specifications and requirements, while reducing the costs incurred through high margin and commission payments.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.