Underreaming
Underreaming is a process used to widen the foot of a bored hole or foundation pier so as to increase its loadbearing area.
It is generally undertaken for safety and/or efficiency reasons, or because of restrictions in the ground, that prevent the use of a pier or pile that is wider along its entire length, and is most common on offshore drilling operations, exploration wells, extended reach drilling, and so on.
Underreaming may also be carried out to create tension piles, where the widened foot resists uplift forces that might otherwise cause the pile to be extracted from the ground. For more information see: Tension pile.
It can also be used in the formation of ground anchors.
Typically, the process involves a drill pipe with cutter blades that can be forced open by pumping a fluid into the pipe. The underreaming tool is kept open by the drilling weight and hydraulics from the pump pressure. The pumps are disengaged when the desired depth has been reached. The underreamer closes and is pulled out of the hole.
It may be necessary to use water flushing systems to remove the reamed spoil from the hole and grout to maintain the integrity of the underream.
There is the risk that if the underreamer is left in the hole for too long, the amount of material left in the hole increases. Also, if penetration rates are too high, this can result in a corkscrewed, under-gauged hole.
It is possible to drill a pilot hole and then underream, or to drill and underream as part of the the same drilling operation.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding.
Types of rapidly renewable content
From forestry to agricultural crops and their by-products.
Terraced houses and the public realm
The discernible difference between the public realm of detached housing and of terraced housing.