Underreaming
Underreaming is a process used to widen the foot of a bored hole or foundation pier so as to increase its loadbearing area.
It is generally undertaken for safety and/or efficiency reasons, or because of restrictions in the ground, that prevent the use of a pier or pile that is wider along its entire length, and is most common on offshore drilling operations, exploration wells, extended reach drilling, and so on.
Underreaming may also be carried out to create tension piles, where the widened foot resists uplift forces that might otherwise cause the pile to be extracted from the ground. For more information see: Tension pile.
It can also be used in the formation of ground anchors.
Typically, the process involves a drill pipe with cutter blades that can be forced open by pumping a fluid into the pipe. The underreaming tool is kept open by the drilling weight and hydraulics from the pump pressure. The pumps are disengaged when the desired depth has been reached. The underreamer closes and is pulled out of the hole.
It may be necessary to use water flushing systems to remove the reamed spoil from the hole and grout to maintain the integrity of the underream.
There is the risk that if the underreamer is left in the hole for too long, the amount of material left in the hole increases. Also, if penetration rates are too high, this can result in a corkscrewed, under-gauged hole.
It is possible to drill a pilot hole and then underream, or to drill and underream as part of the the same drilling operation.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.
The Master Builder: William Butterfield and his times. Book review.
Why construction can't afford to ignore the skills gap.
Building Safety Regulator, 19 August
Gill Kernick appointed Independent Chair of Residents’ Panel.
Connecting knowledge, technology and conservation
Building competence for the future of built heritage.
Building Regulations and Building Safety Act
CIOB publishes free advice for non-domestic clients.
Building Safety Newsletter from MHCLG.