Overheads
In accounting, the term ‘overheads’ refers to expenses that are paid by an organisation on an ongoing basis. Overheads can be fixed (i.e. the same each month) such as rent on office buildings, or variable (i.e. fluctuating depending on business activities) such as delivery costs. Overheads can also be semi-variable, where part of the expense is incurred at a fixed level and another part fluctuates, such as utility charges.
In construction contracts, overheads are often priced proportionately against a project and are the calculated costs of running the company contracted to carry out a project. Often these costs are described as head office administrative costs (in some cases there may also be factory or manufacturing overheads).
Head office costs might include; property costs, finance charges on loans, insurances, staff, taxes, external advisors, marketing and tendering activities and so on. Most contracting organisations will calculate a percentage against project costs to be set against each project somewhere between 2.5% and 5% to cover head office services.
Site overheads such as site accommodation, insurance, and so on, are generally accounted for separately and in contractual terms are included in the preliminaries element of the contract.
On prime cost contracts the contractor is paid for carrying out the works based on the prime cost (the actual cost of labour, plant and materials) and a fee for overheads and profit. This fee can be agreed by negotiation or by competition, and may be a lump sum (which it may be possible to adjust if the actual cost is different from the estimate), or a percentage of the prime cost (which it may be possible to revise if the client changes the nature of the works).
[edit] Related articles on Designing Buildings
- Business.
- Business plan.
- Cash flow statement.
- Cost information.
- Cost overruns.
- Cost planning.
- Direct cost.
- Estimate.
- Head office overheads.
- How to calculate head office overheads and profit.
- Loss and expense.
- Margin.
- Organisation.
- Preliminaries.
- Profit.
- Profit and overheads.
- Project overheads.
- Revenue.
Featured articles and news
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.